My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-27-1989 Council Packet
Orono
>
City Council
>
1950-2024
>
1980-1989 Microfilm
>
1989
>
03-27-1989 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 12:16:27 PM
Creation date
3/28/2025 12:14:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. For setback purposes, the north line of Lot 2 shall be considered <br />the front lot line, the east and west lines of Lot 2 will be <br />considered side lot lines, and the southwest line of Lot 2 abutting <br />the Luce Line Trail right-of-way is considered the rear lot line. <br />8. The applicant is advised that any future subdivision of Lot 1 may <br />require a widened Outlot and cul-de-sac since a subdivision would <br />create a potential for as many as 3 residences being served by a <br />single access road. Applicant is further advised that it is the <br />City's policy to consolidate accesses when feasible for safety <br />purposes. <br />9. No structures may be constructed on the south side of Luce Line <br />Trail in Outlets A and B. <br />10. Subdivision approval will not be granted until complete on-site <br />sewage treatment soil testing infomation is provided, showing that <br />primary and alternate drainfield sites exist within the boundaries of <br />Lot 2. <br />11. If the Title Opinion indicates that right-of-way for Watertown <br />Road has never been formally dedicated, plat drawings shall indicate a <br />dedication for 33* of right-of-way southwest of the center line of <br />Watertown Road. <br />12. Standard Drainage and Utility Easements shall be shown on the <br />plat d awings, with easement widths conforming to the sketch attached <br />as Exhibit C. <br />13. Conservation and Flowage Easements shall be dedicated over the 2 <br />major wetlands on the property. <br />14. Payttient of the standard Park Fee of $100.00 for the new building <br />lot comprised of Lot 2 and Outlot A. <br />The following list of final submittals must be submitted to the Zoning <br />Administrator two weeks prior to the regularly scheduled Council meeting on <br />the second and fourth Mondays of the month: <br />1. RECORD PLAT drawings in the form of two (2) mylar copies and one <br />(1) copy reduced to 1"=200*. Drawing to include: <br />Page 4 of 6
The URL can be used to link to this page
Your browser does not support the video tag.