Laserfiche WebLink
REDWOOD. CEOR <br />WATER 7IGIIT 9 LOCKABLE ELECTRIC BOX—� TREATED <br />� POSTDAR 4 „4 min) <br />PLUGS OR ELECTRIC CONNECTIONS - l-1 51DEL EBOXRIC CONNECTIONS MADE <br />2' PVC CONDUIT SCHEDULE 90 6•SPACE OFPOWER CORD FOR <br />MANHOLE COVER CHAINED 8 LOCKEDT SETTLEMENT <br />SEALED MANHOLE RINGS -� �, [LOOP <br />FINAI r.RAnr , <br />SEALED TANK COVER - <br />PLASTIC ROPE OR CHAIN <br />WITH ANCHOR--� <br />ALARM FLOAT ON SEPARATE <br />ELECTRICAL CIRCUIT —� <br />START- S.E_VEL9 _ �r <br />3'� a <br />SHUT: OFF-.LEYEI.-Q <br />PUMP CONTROL FLOAT <br />r" AT LEAST 12' <br />BELOW GRADE <br />_ WIRE FROM POWER SUPPLY <br />'.91 <br />pM PI STATID ON A ION UP TO UNIFORM <br />SOIL TREATMENT EA <br />F PROPER ORAINBACK <br />IF PIPE AT TANK MUST BE LOWER TITAN <br />UNION. TO GET ELEVATION FOR DRAINBACK. <br />A I/4 INCH WEEP HOLE MUST DE USED <br />— WEEP HOLE <br />NOTES: ELECTRICAL WIRE FROM POWER SUPPLY <br />MUST NOT RUN OVER ANY TANKS BU1 <br />MUST BE LAID BESIDE OTIIER TANKS <br />AND MUST BE PLACED IN CONDUIT <br />ALONG POST <br />ELECTRICAL �^nOS FROM PUMP AND <br />FLOATS M RUN THROUGH <br />CONDUIT CANNOT HAVE GROUND <br />CONiAC <br />1igurc F -R <br />METAL <br />COVER <br />.Ya v <br />-- I <br />CONCRETE <br />MANHOLE <br />RING <br />METHODS OF SECURING MANHOLE COVER TO PREVENT <br />UNAUTHORIZED ENTRY <br />Figurr C-14 <br />' •1 <br />. F.x <br />REDWOOD. CEOR <br />WATER 7IGIIT 9 LOCKABLE ELECTRIC BOX—� TREATED <br />� POSTDAR 4 „4 min) <br />PLUGS OR ELECTRIC CONNECTIONS - l-1 51DEL EBOXRIC CONNECTIONS MADE <br />2' PVC CONDUIT SCHEDULE 90 6•SPACE OFPOWER CORD FOR <br />MANHOLE COVER CHAINED 8 LOCKEDT SETTLEMENT <br />SEALED MANHOLE RINGS -� �, [LOOP <br />FINAI r.RAnr , <br />SEALED TANK COVER - <br />PLASTIC ROPE OR CHAIN <br />WITH ANCHOR--� <br />ALARM FLOAT ON SEPARATE <br />ELECTRICAL CIRCUIT —� <br />START- S.E_VEL9 _ �r <br />3'� a <br />SHUT: OFF-.LEYEI.-Q <br />PUMP CONTROL FLOAT <br />r" AT LEAST 12' <br />BELOW GRADE <br />_ WIRE FROM POWER SUPPLY <br />'.91 <br />pM PI STATID ON A ION UP TO UNIFORM <br />SOIL TREATMENT EA <br />F PROPER ORAINBACK <br />IF PIPE AT TANK MUST BE LOWER TITAN <br />UNION. TO GET ELEVATION FOR DRAINBACK. <br />A I/4 INCH WEEP HOLE MUST DE USED <br />— WEEP HOLE <br />NOTES: ELECTRICAL WIRE FROM POWER SUPPLY <br />MUST NOT RUN OVER ANY TANKS BU1 <br />MUST BE LAID BESIDE OTIIER TANKS <br />AND MUST BE PLACED IN CONDUIT <br />ALONG POST <br />ELECTRICAL �^nOS FROM PUMP AND <br />FLOATS M RUN THROUGH <br />CONDUIT CANNOT HAVE GROUND <br />CONiAC <br />1igurc F -R <br />METAL <br />COVER <br />.Ya v <br />-- I <br />CONCRETE <br />MANHOLE <br />RING <br />METHODS OF SECURING MANHOLE COVER TO PREVENT <br />UNAUTHORIZED ENTRY <br />Figurr C-14 <br />