Laserfiche WebLink
v>2. <br />3. <br />All s\ibsequent additions and outbuildings constixicted after the erection of an original building or buildings shall be constructed of materials comparable to those used in the original construction and shall be designed in a manner conforming with the original architectural design and general appearance. <br />No builddlng or structure of a temporary character, <br />trailer, basement, tent or shack shall be <br />constructed, placed or maintained upon the property <br />except as accessory to and during the construction <br />of permanent buildings. <br />G. Requirement of Development Agreement <br />All development permits authorized within the Highway 12 <br />Corridor Study Area shall be subject to the execution of <br />development agreement. Said development agreement shall <br />clearly identify the timing of all of the public <br />improvements associated with the development and the <br />developers' financial commitments related to these <br />^improvements. The agreement shall also include any and <br />all other conditions of approval deemed necessary to <br />insure compliance with the Special Minimihn Requirements <br />for Rezoning the Highway 12 Corridor Study Area, as well <br />as the goals and objectives of the Highway 12 Corridor <br />Study.