My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-17-2025 - Agenda Packet Planning Commission - PC Packet
Orono
>
Planning Commission
>
2025
>
03-17-2025 - Agenda Packet Planning Commission - PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:21 AM
Creation date
3/18/2025 9:25:39 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet Planning Commission
Section
Planning Commission
Subject
PC Packet
Document Date
3/17/2025
Retention
After
Protection
Public
Jump to thumbnail
< previous set
next set >
Attachment
ID:
1
Attachment:
Asbuilt Survey 23170 dated 11-12-24.pdf
(857KB)
Text box
ID:
1
Creator:
Katie Fitzsimmons
Created:
3/18/2025 9:31 AM
Modified:
3/18/2025 9:31 AM
Text:
mailto:rvickery@vickeryeng.com
ID:
2
Creator:
Katie Fitzsimmons
Created:
3/18/2025 9:31 AM
Modified:
3/18/2025 9:31 AM
Text:
mailto:matthew.m.jasper.mil@army.mil
ID:
3
Creator:
Katie Fitzsimmons
Created:
3/18/2025 9:31 AM
Modified:
3/18/2025 9:31 AM
Text:
https://usg01.safelinks.protection.office365.us/?url=http%3A%2F%2Fwww.vickeryeng.com%2F&data=05%7C02%7Cmatthew.m.jasper.mil%40army.mil%7Cc792dabf0efe447a0f8308dd13c66e8a%7Cfae6d70f954b481192b60530d6f84c43%7C0%7C0%7C638688465197834679%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=iT%2BUH5KsF87gI62IOJ05pv0W%2FvqsUN0qkqhDxcvn8HQ%3D&reserved=0
ID:
4
Creator:
Katie Fitzsimmons
Created:
3/18/2025 9:31 AM
Modified:
3/18/2025 9:31 AM
Text:
PC Exhibit G
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From:Ronald W. Vickery, P.E. <br />To:Jasper, Matthew M CSM USARMY NG MNARNG (USA) <br />Subject:VEC 24-055 - 4745 North Shore Drive, Orono, MN <br />Date:Tuesday, December 3, 2024 12:15:20 PM <br />Attachments:Asbuilt Survey 23170 dated 11-12-24.pdf <br />Matt - as requested, I reviewed the attached as-built survey for your project. As we previously <br />discussed, the step pieces needed protection from erosion by placing additional boulders <br />along the staircase to keep the stairs protected. <br /> <br />Also as we discussed, at the bottom of the hillside where the shed was previously located, <br />there was a retaining wall that had been washed over. The contractor rebuilt that wall and <br />extended it to the stairway because of how steep the hillside was. There was a concern that <br />the hill could potentially slide and jeopardize the stairs. Therefore, the additional wall was <br />required for overall stability. <br /> <br />Please let me know if you have questions or need anything else. <br /> <br />Thanks, <br /> <br />Ron <br /> <br /> <br />We’ve moved! See our new address below! <br /> <br /> <br />Ronald W. Vickery, PE <br />Vickery Engineering & Consulting, LLC <br />Post Office Box 86 <br />Grandy, MN 55029 <br />Phone: 952-465-8272 <br />www.vickeryeng.com <br /> <br />~Engineering Solutions for an Unstable World~ <br /> <br /> <br />61
The URL can be used to link to this page
Your browser does not support the video tag.