My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-17-2025 - Agenda Packet Planning Commission - PC Packet
Orono
>
Planning Commission
>
2025
>
03-17-2025 - Agenda Packet Planning Commission - PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:21 AM
Creation date
3/18/2025 9:25:39 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet Planning Commission
Section
Planning Commission
Subject
PC Packet
Document Date
3/17/2025
Retention
After
Protection
Public
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Katie Fitzsimmons
Created:
3/18/2025 9:31 AM
Modified:
3/18/2025 9:31 AM
Text:
mailto:katie@s2traffic.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Orono Garage Storage Trip Generation Review Page | 2 <br />For comparison purposes, the trip generation potential of a 128,000 SF light industrial building was investigated <br />as this would be the size and type of use that would be likely for this parcel. Table 2 summarizes the trip <br />generation estimates for a light industrial building per ITE’s Trip Generation Manual. <br />Table 2 - Trip Generation for Light Industrial <br />A general light industrial use for the site is estimated to generate over 100 peak hour trips and 623 daily trips. <br />In summary, the number of vehicle trips anticipated to be generated by the Proposed Project is extremely low, <br />approximately one new vehicle trip every 30 minutes during the peak hour, and impacts to existing traffic <br />operations will be minimal. If the site were to be developed into a light industrial building the trip generation <br />potential increases to over 100 trips for the peak hours and 623 daily trips. <br />Please contact Katie Schmidt at katie@s2traffic.com with any questions. <br />Figure 2. Site Plan <br />Trips Generated: <br />Enter Exit Enter Exit <br />General Light Industrial 110 128,000 s.f.101 15 18 84 623 <br />101 15 18 84 <br />102Totals 116 623 <br />PM Peak Weekday <br />ADT <br />Land Use ITE Land <br />Use Code Size AM Peak <br />202
The URL can be used to link to this page
Your browser does not support the video tag.