My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-17-2025 - Agenda Packet Planning Commission - PC Packet
Orono
>
Planning Commission
>
2025
>
03-17-2025 - Agenda Packet Planning Commission - PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:21 AM
Creation date
3/18/2025 9:25:39 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet Planning Commission
Section
Planning Commission
Subject
PC Packet
Document Date
3/17/2025
Retention
After
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
March 17, 2025 <br />Updated Applicable Regulations <br />Industrial Site Plan Review/ Preliminary Plat / Conditional Use Permit Analysis <br />Section 78-825 Lot area, height, setbacks, and lot coverage <br />(a) Minimum Lot Area Requirement & (c) Lot Width: <br />Industrial Lot Area Lot Width <br />Required 40,000 s.f 200’ <br />Actual 168,929.28 s.f. (4.88 acres)276’ <br />(d) Building Setbacks: <br />Industrial Required Proposed <br />Front (OCB R N)35’35’ <br />North Side 20’ 35’ <br />South Side 20’35’ <br />Rear (East)20’ 45’ <br />(f) Lot Coverage / Structural Coverage: <br />Total Lot Area Permitted Proposed <br />212,572 s.f. (4.88 acres)45%95,900 s.f. (2.2 Ac) <br />45% <br />Section 78-1701. Hardcover Calculations: <br />Stormwater <br />Overlay <br />District Tier <br />Total Area in <br />Tier <br />Allowed <br />Hardcover <br />Existing <br />Hardcover Proposed Hardcover <br />Tier 5 168,929.28 s.f.143,589.8 s.f. <br />(85 %)Vacant 126,869 s.f./ 3.671 Acres <br />(75 %) <br />Section 78-825 (e) Building height. The industrial district allows for a 40’ defined building height. The <br />lot is relatively flat. Most of the lot sits at 1025’ elevation grade. The proposed first floor elevations of the <br />buildings range from 1023’ to 1025’. The overall site will maintain a similar grade to the existing lot. <br />The buildings are proposed to have a 39.5-foot peak height (measured from the first-floor elevation to <br />the top of the gable) and measure 31.75 feet to the midpoint of the roof. With the minimal grading <br />required for the site, staff anticipates the defined height (grade to the midpoint of a gabled roof) to be <br />approximately 32 feet. The proposed development will conform to the 40’ defined height maximum. <br />Section 78-826 –Building Design and Construction: <br />(5) Long Facades: Where large structures with overly-long facades (walls) are proposed, such as <br />warehouses, building mass should be articulated with variations in the building plane and <br />parapet height and through the use of other unique design or site plan features. The applicant <br />104
The URL can be used to link to this page
Your browser does not support the video tag.