My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-2025 CC Agenda Packet
Orono
>
City Council
>
2025
>
03-10-2025 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2025 3:48:13 PM
Creation date
3/7/2025 2:04:38 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
AGENDA PACKETS
Section
ADMINISTRATION
Subject
Regular Meeting
Retention Effective Date
3/10/2025
Retention
Permanent After File Date
Protection
Public
Supplemental fields
Code
ADM 00500
Date
3/10/2025
Description
Council Meeting Packet
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CARVER <br />CONSTRUCTION <br />Feb 22, 2025 <br />City of Orono <br />Attn: Joe Ruthenberg <br />365 Old Crystal Bay Rd N <br />Orono, MN 55356 <br />952-249-46-84 <br />juthenberg@oronomn.gov <br />Agreement: <br />Carver Construction, Inc. will provide products & services as outlined in this estimate to <br />City of Orono at the above specified address. <br />Specifications: Building Permit NOT included. <br />• Construct interior wall — commercial steel studs/track, 5/8" Type X Fire rated <br />Drywall Board. Approximately 10'-6" x 8'-0". <br />• Abandon (1) electrical outlet on adjacent wall, add (2) outlets to new wall(one on <br />each side). <br />• Repair ceiling grid accordingly on each side of new wall. <br />• Prime/paint new wall only. Color recipe to be provided by City of Orono. <br />• Carpet "base trim" to match existing as close as possible, sample to be provided <br />for approval. <br />• Dust control via temporary poly walls, site protection, and project clean up <br />as necessary. <br />Proiect Estimate: $ 7,275.00 <br />Option: <br />1) Add insulation to new wall cavity — Add $ 850.00 <br />Payments: * 50% with a copy of signed agreement. <br />* Balance upon completion. <br />NOTE: <br />1) FIRE SUPPRESSION SPRINKLER SYSTEM MODIFICATION NOT INCLUDED. <br />2) ANY RELATED CONSTRUCTION PERMITS NOT INCLUDED(IE: ELECTRICAL, <br />PLUMBING, BUILDING, ETC. <br />3) DUCT WORK/HVAC NOT INCLUDED. <br />Page 1 <br />Carver Construction, Inc. / 1575 Sally Ave Watertown, MN 55388 / 763-458-0954 <br />tim(&carverconstruction.com / Lic# BC377469 <br />►y: <br />
The URL can be used to link to this page
Your browser does not support the video tag.