My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-2025 CC Agenda Packet
Orono
>
City Council
>
2025
>
03-10-2025 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2025 3:48:13 PM
Creation date
3/7/2025 2:04:38 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
AGENDA PACKETS
Section
ADMINISTRATION
Subject
Regular Meeting
Retention Effective Date
3/10/2025
Retention
Permanent After File Date
Protection
Public
Supplemental fields
Code
ADM 00500
Date
3/10/2025
Description
Council Meeting Packet
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO.7559 <br />Schedule and applied to each newly created lot on a per lot basis. Park dedication fees <br />are based on Hennepin County's assessment of the predeveloped land value. Based on <br />the 2024 Fee Schedule, the Park Dedication Fee will be due for 4 new lots, in the <br />amount of $ 15,431.95. <br />B11. Plans and Specifications. The following plans and specifications shall be submitted for <br />review and approval by the City and other appropriate jurisdictions before Final Plat <br />approval, to ensure that the proposed plat will accomplish the intended purposes: <br />1. Final grading, drainage, and erosion control plan showing existing and proposed <br />contours, anticipated building locations, elevations, stormwater facilities and <br />calculations, public road, utilities and erosion control measures to be used during <br />construction. <br />2. Final Landscape Plan which shall include planting plans with tree calculations. <br />3. Final Stormwater Management Plan. <br />4. Final stormwater pollution prevention plan (SWPPP). <br />5. Sufficient detail to meet the recommendations of the City Engineer. <br />B12. Council approval is based on the entire record and the above Findings. Any amendments <br />to the plans that are not in conformity with City codes may require further Planning <br />Commission and City Council review. This approval does not limit the City from revising or <br />amending these conditions as the review process continues. <br />1313. Authorities granted by this resolution run with the Property not with the Owners, but are <br />permissive only and must be exercised by filing a Final Plat application within one year of <br />the date of Council approval, or the preliminary plat approvals will expire on that date. <br />FINAL SUBMITTALS: <br />The Developer shall complete all requirements for Final Plat Approval and all final submittals <br />must be submitted to the Planning Department at least four (4) weeks before the regularly <br />scheduled Council meeting on the second and fourth Mondays of the month. These submittals <br />are as follows: <br />C1. Record Plat Drawings. Record plat drawings in the form of two (2) mylar copies (one <br />copy for the City's records and one for filing with Hennepin County) and one (1) copy <br />reduced to 1" = 200'. A digital copy is also required. Drawing to include: <br />a. Lot lines platted per preliminary plat survey/drawing by Civil Methods Inc., dated <br />03/04/2025 attached hereto as Exhibit B, except as modified herein. <br />252 <br />
The URL can be used to link to this page
Your browser does not support the video tag.