Laserfiche WebLink
PILE INSTALLATION DATA <br />DATE: 1/1b/89 <br />CONCORDIA <br />RESIDENCE <br />1635 <br />CONCORDIA 11REE1 <br />4220 <br />89-638 <br />Pile <br />Date <br />Cut-Off <br />Total <br />Length <br />Length <br />Felow <br />TipFes <br />Final <br />ri ,! S <br />/ <br />Driven <br />Elev <br />Length <br />Cut-off <br />Cut-Off <br />E1ev <br />f'es�s�. <br />Remarks <br />(ft) <br />(ft) <br />(ft) <br />(ft) <br />(ft) <br />(bpf) <br />1 <br />12-30-88 <br />96.3 <br />48.0 <br />8.0 <br />40.0 <br />56.3 <br />31 33,40 <br />lest Pile 11 <br />2 <br />1-3-89 <br />96.3 <br />40.0 <br />1.0 <br />39.0 <br />57.3 <br />28,33 41 <br />3 <br />1-3-89 <br />96.3 <br />40.0 <br />0.5 <br />39.5 <br />56.8 <br />35,38,42 <br />4 <br />1-3-89 <br />96.3 <br />40.0 <br />0.0 <br />40.0 <br />56.3 <br />25,25. 7 <br />netap 20/.5" <br />5 <br />1-3-89 <br />96.3 <br />40.0 <br />0.5 <br />34.5 <br />5( .8 <br />30,30,3? <br />6 <br />1-3-89 <br />96.3 <br />40.0 <br />0.5 <br />34.5 <br />56.8 <br />28,27,28 <br />Frtap 20/.5" <br />7 <br />1-3-89 <br />96.3 <br />40.0 <br />0.0 <br />4C.0 <br />5E.3 <br />28,30,32 <br />Re ap 20/1" <br />8 <br />1-3-89 <br />96.3 <br />40.0 <br />1.0 <br />34.0 <br />57.3 <br />7,4(,45 <br />9 <br />1-3-89 <br />9E..3 <br />40.0 <br />0.0 <br />4C.0 <br />56.3 <br />3 1 , 3 2 . ? 5 <br />10 <br />12-3C-88 <br />98.8 <br />49.0 <br />1(.0 <br />39.0 <br />54.8 <br />38,42.24/6"Test <br />Pile f4 <br />11 <br />1-3-89 <br />98.8 <br />40.0 <br />* <br />40.0 <br />51.5 <br />30,31 35 <br />*214"Below cut off elev. <br />12 <br />1-3-89 <br />9f.3 <br />40.0 <br />0.5 <br />39.5 <br />5E.8 <br />27,35,37 <br />13 <br />1-4-89 <br />96.3 <br />45.0 <br />2.0 <br />43.0 <br />53.3 <br />34,35,37 <br />14 <br />1-4-89 <br />96.3 <br />45.0 <br />3.0 <br />42.0 <br />54.3 <br />%5,45,43 <br />15 <br />1-4-89 <br />96.3 <br />45.0 <br />3.0 <br />42.0 <br />54.3 <br />?P,38,40 <br />16 <br />1-4-89 <br />96.3 <br />45.0 <br />2.0 <br />4? .0 <br />53.3 <br />29,30,30 <br />17 <br />12-30-88 <br />96.3 <br />50.0 <br />2.5 <br />4 .5 <br />48.8 <br />31,33,34 <br />Test Pile /2 <br />18 <br />1-4-89 <br />96.3 <br />45.0 <br />5.5 <br />39.5 <br />16.6 <br />35,42,50/6" <br />19 <br />1-4-89 <br />96.3 <br />45.0 <br />4.0 <br />41.0 <br />55.3 <br />31,36,43 <br />20 <br />1-4-89 <br />96.3 <br />45.0 <br />0.5 <br />44.5 <br />51.8 <br />35,35,41 <br />21 <br />1-4-89 <br />96.3 <br />45.0 <br />0.0 <br />45.0 <br />51.3 <br />26,30,31 <br />22 <br />1-3-89 <br />96.3 <br />45.0 <br />0.0 <br />45.0 <br />51.3 <br />18,30,30 <br />Retap 20/.5" <br />23 <br />1-4-89 <br />96.3 <br />45.0 <br />1.0 <br />44.0 <br />52.3 <br />30,30.30 <br />24 <br />1-4-89 <br />96.3 <br />45.0 <br />0.0 <br />45.0 <br />51.3 <br />20,20,20 <br />Retap 30/1.E" <br />25 <br />1-4-89 <br />96.3 <br />45.0 <br />0.0 <br />45.0 <br />51.3 <br />25,25,25 <br />Retap 30/1.25" <br />26 <br />1-3-89 <br />96.3 <br />45.0 <br />0.5 <br />44.5 <br />51.8 <br />3C,30,31 <br />27 <br />1-3-89 <br />96.3 <br />45.0 <br />2.0 <br />43.0 <br />53.3 <br />30,30,40 <br />28 <br />1-3-89 <br />96.3 <br />45.0 <br />1.0 <br />44.0 <br />52.3 <br />33,33,36 <br />29 <br />1-3-89 <br />96.3 <br />40.0 <br />0.5 <br />39.5 <br />56.8 <br />2C,22,25 <br />Petap 20/.5" <br />30 <br />1-3-89 <br />98.8 <br />45.0 <br />0.0 <br />45.0 <br />53.8 <br />3E,?9,50 <br />31 <br />1-3-89 <br />9e.6 <br />45.0 <br />0.5 <br />44.5 <br />54.3 <br />3?,42,41 <br />32 <br />1-3-89 <br />98.8 <br />45.0 <br />* <br />45.0 <br />52.0 <br />30,32,35 <br />*1'10"Eelow cut off (lev <br />33 <br />1-3-89 <br />98.8 <br />45.0 <br />* <br />45.0 <br />51.5 <br />28,30,35 <br />*214"eelow cut off e1ev. <br />34 <br />1-4-89 <br />98.e <br />45,E <br />* <br />45.0 <br />51.0 <br />28.30,30 <br />02.5'eel ow cut ccff e'ev. <br />Retap 20/.5" <br />35 <br />1-4-89 <br />98.e <br />45.0 <br />* <br />45.0 <br />51.0 <br />28,28,28 <br />*2.5'Eelow cut off a ev. <br />Retail 20/.75" <br />36 <br />1-3-69 <br />9E..3 <br />40.0 <br />4.0 <br />36.0 <br />60.3 <br />4:,45,56 <br />37 <br />1-3-89 <br />96.3 <br />40.0 <br />8.0 <br />32.0 <br />64.3 <br />55 56,61 <br />38 <br />1-3-89 <br />96.3 <br />35.0 <br />0.5 <br />34.5 <br />61.8 <br />30,32,35 <br />39 <br />12-30-88 <br />96.3 <br />50.0 <br />18.0 <br />32.0 <br />64.3 <br />36,38,41 <br />Test Pile 53 <br />40 <br />1-3-89 <br />96.3 <br />35.0 <br />2.5 <br />32.5 <br />63.8 <br />31,35,37 <br />41 <br />1-3-89 <br />96.3 <br />35.0 <br />1.0 <br />34.0 <br />62.3 <br />35,40.43 <br />42 <br />1-3-89 <br />96.3 <br />40.0 <br />1.0 <br />39.0 <br />57.3 <br />37 40,45 <br />43 <br />1-3-89 <br />96.3 <br />40.0 <br />3.5 <br />36.5 <br />59.8 <br />34.37,42 <br />44 <br />1-3-89 <br />96.3 <br />40.0 <br />0.5 <br />39.5 <br />56.8 <br />34,35.39 <br />45 <br />1-3-89 <br />98.8 <br />40.0 <br />3.0 <br />37.0 <br />61.8 <br />35 40,45 <br />46 <br />1-3-89 <br />98.8 <br />40.0 <br />2.0 <br />38.0 <br />60.8 <br />35,37,50 <br />47 <br />1-3-89 <br />98.6 <br />35.0 <br />• <br />35.0 <br />62.8 <br />31,37,41 <br />*116elow cut off ele,.. <br />48 <br />1-4-89 <br />96.3 <br />45.0 <br />2.0 <br />43.0 <br />53.3 <br />35.37,40 <br />Total Length <br />------------------- <br />1S51.0 <br />t�� teltlrp <br />