My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-24-2025 CC Agenda Packet
Orono
>
City Council
>
2025
>
02-24-2025 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2025 4:12:50 PM
Creation date
2/21/2025 4:09:32 PM
Metadata
Fields
Template:
x Minutes and Agendas
Minutes or Agenda
Agenda
Meeting Date
2/24/2025
Board
City Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Date: February 24, 2025 <br />Title: Street Improvements - Brown Road N (25-002) - Award <br />Presenter: Adam Edwards, City Administrator / Engineer <br />Section: Consent Agenda <br />Item: 7 <br />Purpose: <br />The purpose of this action item is to award the contract for the Brown Road North Maintenance <br />Project (25-002). <br />2. Background: <br />At the July 8, 2024 Council Work Session, the council directed staff to proceed with design for the <br />Brown Road North Maintenance Project. Since then Staff and our consulting firm have been <br />working on the design and bid package for the project. Brown Road North is a Municipal State <br />Aid (MSA) Road. As such the city receives state aid funding for its maintenance. State Aid <br />revenues come from the state gas tax. As a MSA project MnDOT State Aid is required to review <br />the design which they have done and granted approval. Staff received bids on February 13, 2025. <br />3. Scope: <br />The project consists of the reclamation of the existing pavement, new pavement, and repairs to <br />existing concrete curbs and stormwater infrastructure. <br />4. Cost: <br />The city received nine bids. The Bid Summary is in Exhibit A. The low bid for $ 413,246.05 is <br />from Valley Paving, Inc. In addition to the construction cost, Bolton and Menk provided a <br />proposal not to exceed $ 43,000 for construction oversight. (Exhibit B). <br />Who <br />Work <br />Cost <br />Status <br />Bolton and Menk <br />Brown Road design and bid <br />$ 49800.00 <br />,.approved <br />Previously <br />approved <br />Braun Intertec <br />Geotechnical evaluation <br />$ 5,745.00 <br />Complete <br />Valley Paving <br />Construction <br />$ 413,246.05 <br />Bolton and Menk <br />lConstruction oversight <br />$ 43,000.00 <br />TOTAL <br />1 <br />$ 511,791.05 <br />Funding: <br />Funding for the project will come from a combination of the MSA fund and stormwater fund. <br />Estimated <br />Fund <br />Amount <br />MSA Fund <br />$ 375,900 <br />Storm Sewer Fund <br />$ 135,000 <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.