My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-24-2025 CC Agenda Packet
Orono
>
City Council
>
2025
>
02-24-2025 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2025 4:12:50 PM
Creation date
2/21/2025 4:09:32 PM
Metadata
Fields
Template:
x Minutes and Agendas
Minutes or Agenda
Agenda
Meeting Date
2/24/2025
Board
City Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
KRIHA ELECTRIC, <br />ARIBIMONTGOMERY MNLC 56069 <br />PROP <br />• Phone:507-364-7520 DATE <br />info@krihaelectric.com <br />--------- — DESC <br />191Wt110]�,I=1[7 <br />CITY OF ORONO <br />2700 Kelley Parkway <br />ORONO MN 55356 <br />LOC <br />1059 <br />11 /13/2024 <br />Lift Stations 4 & 27 Rehab. <br />2700 Kelley Parkway <br />ORONO MN 55356 <br />DJ <br />Proposal to remodel the City of Orono - Lift Station #4 and Lift Station #27: <br />Kriha Electric is pleased to provide the following proposal as requested. <br />Lift Station 4 remodel will consist of the following items: <br />Duplex Control panel: <br />The enclosure is 2-door, pad -mounted, 48"H x 60"W x 12"D with an 18" vented skirt. <br />It is made of Stainless Steel, rated Nema 3X, and has a 3-point pad-locka handle. The <br />enclosure features inner dead front doors and a steel white back plate.The control panel <br />will be built to operate from 240V, 3PH, 4W, 60HZ incoming power. it will provide control <br />for 2 pumps in response to wetwell level. Level of wetwell will be sensed by a transducer <br />and backed up by floats. The following components will be included: <br />Qty - Description: <br />1 - 3P; 240VAC; 100A; Service Entrance Rated Circuit Breaker Main Disconnect; <br />1 - 3P; 240VAC; 100A; Circuit Breaker as an Emergency Disconnect; Interlocked with Main <br />1-100A;Emergency Power Receptacle; with angle adapter (re -use existing receptacle) <br />1 - 100A: ASCO; Series 300 ATS; <br />2 - 3P; 240VAC; 30A Circuit Breaker for Pump Disconnect; <br />1 - 10A Breaker <br />1 - 15A Breaker <br />2 - 20A Breaker <br />2 - NEMA Motor Starter <br />1 - Convenience Receptacle <br />1 - Phase monitor <br />1 - Surge Arrestor; <br />1 - Heater <br />2 - Pump Protective Module <br />2 - Green Pilot Light <br />2 - Red Pilot Light <br />2- Push Button <br />2 - Runtime meter <br />1 - PLC <br />1 - Symcom Model ISS-105 float controller with intrinsically safe circuit extensions <br />A/R - IS Barrier for transducer <br />1 - Red Strobe Alarm Light <br />1 -Alarm Horn with silence button <br />1 - Re -install the existing Mission unit and power supply in the new panel <br />1 - Submersible transducer <br />3 - Float switches <br />1 - Cable rack and J hook <br />A/R - Labor and start up <br />Note: No concrete work required <br />PROPOSAL <br />1 <br />KEV <br />
The URL can be used to link to this page
Your browser does not support the video tag.