Laserfiche WebLink
k <br />COWSTRUCTIOH PERMITS AND INSPECTION FEES (CONT.) <br />Permit Type r^ee <br />Applicable <br />Code Section <br />BUILDING MOVING OR LIFTING <br />Fees for this activity are _ _ _ _ _ <br />Fees and any necessary surcharges <br />(Ord. 227) <br />in addition to required building or demolition permits. <br />buildingarere1 red to pay costs of building code <br />inspections, public works inspections of streets and reasonable police escort service <br />on oversize movements. <br />-Lifting accessory buildings <br />(no move across lot lines) <br />-Lifting principal buildings <br />(no move across lot lines) <br />(include pre-lift inspection fee) <br />-Moving accessory building within normal <br />highway clearance <br />(max. 8* wide/max. 13'-6" high/max. 45’ <br />-Moving principal buildings over any lot <br />line, onto or off any lot within Orono; <br />includes any move on or over any City <br />street even if not originating or term­ <br />inating in Orono (Include all over­ <br />size loads exceeding 12' wide and/or <br />15* high). <br />$ 30.00 <br />$ 75.00 + engineering fee if necessary <br />No moving permit required <br />long) <br />$150.00 <br />-Pre-move code inspection, principal buildings; <br />a) Building within Orono to be relocated $ 50.00 <br />within Orono <br />b) Building outside Orono to be moved $150.00 <br />into Orono (max. radius 25 miles) <br />16