Laserfiche WebLink
PROJECT:.PLACE:Puinhouse No. 30rono. Minnesota <br />CONTRACTOR: Richmar Construction <br />PA ;:ent no. :_ _ _ _1FILE NO.:_ _ _ _ _13950 <br />DATE: November 7, 1990 <br />tatement of work <br />Contract Item Unit <br />Uniu Est'd Quantity Amount <br />Price Quantity To Date To Date <br />BASE BID - PUMPHOUSE NO. 3 <br />Construe' pumping facility for Welj. No. 3 <br />incl. masonry structure, pumps, piping, <br />chemical feed equipt., compressed air <br />system, site work, electrical controls <br />& cor»exated appurtenances L.S. <br />Install 4" topsoil, jeed, <br />fertilizer & mulch Acre <br />$206,440.00 <br />4,000.00 <br />L S <br />0.5 <br />1.5Z $3,043.00 <br />TOTAL BASE BID WORK t3,043.00 <br />ALTERNATE NO. 1 <br />Substitute preformed wall & roof panels <br />in lieu of wood shakes on the roansa- 1 <br />roof as ADD or DEDUCT L S <br />TO'AL ALTERNATE NO. 1 <br />TOTAL BASE BID <br />TOTAL ALTERNATE NO. 1 <br />TOTAL WORK COMPLETED TO DATE <br />$2,900.00 L S <br />$3,043.00 <br />0.00 <br />$3,043.00 <br />$0.00 <br />STORED MATERIALS <br />1. Two 6* dia. hydropneumatic tanks t saddles ** <br />jne 8" pump control valve <br />’^"•*TAL STORED MATERIALS <br />Invoice attached <br />Page 1 <br />$17,543.00 <br />2,650.00 <br />$20,193.00 <br />13950PR