Laserfiche WebLink
2. Gate- detail sheet for fencing was provided. Please clarify if a gate is being proposed <br />and the location. A knox box for emergency services will be required. <br />3. Sales/Management Office- Are you proposing any sales or management office in the <br />development? <br />4. Garbage- Are you proposing any garage containers or enclosures? Please clarify. If so a <br />site plan for the location and a detail for the enclosure must be submitted. <br />5. Declaration <br />a. Section 7.5 Parking- indicates a surface parking plat. Please provide a copy of <br />this internal surface parking plan <br />b. Section 7.7 Signage- Is there any signage being proposed for the development? <br />The declaration comments indicate signage for each individual <br />c. Section 8.1- Expansion- The document indicated building expansion will be <br />reviewed with an architectural board. Are you planning to allow exterior <br />expansions such as decks, front porches, ect? The land is not owned by the unit <br />holders and permitting may be challenging. Can you please provide additional <br />information of the scope of future unit expansions? <br />d. Section 14.9- Additional property, describes a future expansion/build out to the <br />abutting property. Please provide additional information of the scope of the <br />future phases/expansions of the site. <br /> <br />Building Official: <br />The following information should be included in the commercial building permit application: <br />• Full Code Analysis with both an Architectural and Structural plan set <br />• Plans meeting the Accessibility Code <br />• Fire protection/unit separation info <br />• SAC Determination with Met Council <br />• State Plumbing Plan Review – Plumbing Permit <br />• Heating/Cooling Plan – Mechanical permit <br /> <br /> <br /> <br />Estimated Fees (Fee Schedule Attached): <br />Fee Type Breakdown Estimated Total <br />Water Area Connection $4,370 x 85 units $371,450.00 <br />Water Connection Permit Fee $150.00 x 85 units $12,750.00 <br />Sewer Area Connection $6000 x 85 units $510,000.00 <br />Sewer Connection Permit Fee $150.00 x 85 units $12,750.00 <br />Sewer Availability Charge(Met <br />Council)- <br />$2,485.00 x 85units $211,225.00 <br />*A SAC determination is required by the Met Council and can alter this fee <br />Stormwater Drainage Trunk Fee ($9,690.00 x 4.89Ac $47,384.10 <br /> <br />ESTIMATED FEE TOTAL $1,135,559.10 <br /> <br /> <br /> <br />Timeline for review: <br />January 21st- Planning Commission review with public hearing <br />February 10th – City Council review of the Conditional Use Permit and Preliminary Plat <br />February 24th- City Council review of Final plat, development agreement and all associated <br />91