Laserfiche WebLink
FILE #LA25-000001 <br />18 February 2025 <br />Page 3 of 4 <br /> <br /> <br /> <br />L1B2, south of Fox Street is currently 2.94 acres (gross) and includes land to be dedicated as right-of-way. The net <br />2.8-acre property will have ±340 feet of frontage on Fox Street and ±390 feet on Orono Orchard Road. The Fox <br />Street frontage is the narrower of the two and is therefore considered to be the “front”, and Orono Orchard Road is <br />a side street. The proper principal building setbacks have been shown on the preliminary plat. This lot has a <br />through driveway with one access onto Orono Orchard Road approximately 50 feet from the Dakota Rail Regional <br />Trail managed by Three Rivers Park District. A second access is located on Fox Street, which continues northward <br />into the shared private drive on the west side of the property. There is an existing easement over L1B2 for driveway <br />purposes benefitting the property at 1465 Fox Street which is proposed to remain. <br /> <br />Utilities <br />Stormwater <br />The creation of one new lot does not trigger the MCWD’s Stormwater Rule, no stormwater facilities will be <br />required; the project will require payment of the City’s Stormwater Drainage Trunk fee for the newly platted lot. <br /> <br />Private Water Supply Wells <br />The properties are currently served by and will continue to be served by private water supply wells. <br /> <br />City Sewer <br />The property is currently served by City sewer. <br /> <br />In 1999, the septic systems on the property were failing, and to resolve the issue most efficiently, the City approved <br />three sewer connections despite the property not being within the MUSA (Metropolitan Urban Service Area). This <br />approval was granted as part of a guest house conditional use permit and the owner’s willingness to sign a <br />restrictive covenant limiting the property to three dwelling units. Copies of the resolution and covenant are <br />attached as Exhibit J. Included with preliminary plat approval, the applicant is requesting termination of this <br />restrictive covenant. It is contrary to standard practice to use a restrictive covenant or resolution to control density <br />or enforce zoning regulations to govern the subdivision of a property. The City’s comprehensive plan and zoning <br />regulations are the appropriate legal tools. <br /> <br />Fees <br /> Stormwater Drainage Trunk Fee <br />The stormwater drainage trunk fee (“SWDT fee”) will be determined by the City’s Fee Schedule at the time of <br />the Final Plat submittal. According to the current 2025 Fee Schedule, the development of a property within a 2- <br />acre residential zone requires payment of $8,060 per each new lot and/or development of a vacant lot. As <br />proposed, the developer will be subject to payment of a SWDT fee for 1 new lot or $8,060*. <br /> <br /> Park/Trail Easement + Park Fees or Dedication <br />The Parks, Open Space, and Trail Plan chapter of the 2040 Orono Comprehensive Plan does not specify the <br />need for a neighborhood park at this location. The City’s golf course is located approximately 1/4 of a mile to <br />the north of the property; Woodhill Country Club, a private course, is located about ½ mile to the east. As there <br />is no specified need for a land dedication for a park or trail in this location, it would appear that the dedication <br />of land for park purposes is not required. <br /> <br />Absent the need for a land dedication, the project will be subject to the City’s 2025 Park Dedication Fee. This <br />fee is determined by the fair market value of the land being subdivided. The Hennepin County Assessor will be <br />consulted to determine the market value of the land to establish the amount of the fee. The developer is <br />proposing two building sites or 1 new lot. The Park Fee for this development will be approximately $8,168*. <br /> <br />*The fee amounts will be confirmed at the time of Final Plat submittal. <br />285