My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-18-2025 Planning Commission Packet (2)
Orono
>
Planning Commission
>
2025
>
02-18-2025 Planning Commission Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 10:05:33 AM
Creation date
2/20/2025 9:48:31 AM
Metadata
Fields
Template:
x Minutes and Agendas
Minutes or Agenda
Agenda
Meeting Date
2/18/2025
Board
Planning Commission
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date Application Received: 12/03/2024 <br />Date Application Considered as Complete: 02/04/2025 <br />60-Day Review Period Extension Expires: 04/05/2025 <br /> <br /> <br />To: Chair Bollis and Planning Commission Members <br /> Adam Edwards, City Administrator <br /> <br />From: Matthew Karney, Planner <br /> <br />Date: 18 February 2025 <br /> <br />Subject: #LA24-000065, Hartman Companies, 980 Heritage Lane <br />Conditional Use Permit (Retaining Walls) – Public Hearing <br /> <br /> <br />Background <br />The applicant proposes a new retaining wall to provide a level access point to an existing lake stair with <br />railings, within 75 feet of the Ordinary High Water Level (OHWL) of Tanager Lake. Currently, the land near <br />the stair access is sloped and not level with the wooden landing of the stairs. <br /> <br />Conditional Use Permit Analysis: <br />The applicant has provided a site plan with existing and proposed conditions, retaining wall design and <br />elevations, and a hardcover worksheet. The proposed stone retaining wall will be over 2 feet in height, <br />but no more than 18 inches will be exposed, connecting the existing slope to the lake access stair. <br /> <br />Section 78-305 & 78-1279 – Setbacks: <br /> <br />Section 78-1680 and 78-1700 – Hardcover Calculations: <br />Stormwater <br />Overlay <br />District Tier <br />Total Area <br />in Zone <br />Allowed <br />Hardcover Existing Hardcover Proposed Hardcover <br />Tier 1 95,396 s.f. 23,849 s.f. <br />(25 %) <br />17,918 s.f. <br />(18.78%) <br />72 s.f. within <br />75’ setback <br />17,935 s.f. <br />(18.8%) <br />89 s.f. within <br />75’ setback <br /> <br />Conditional Use Permit (Sections 78-1279 and 78-916) <br />Section 78-1279(5)(c) states: <br />“A wall in the shore setback zone, within a defined bluff and bluff setback; and/or a replacement wall 4 <br />feet in height or greater; and/or any new walls shall require a conditional use permit. New walls and <br />replacement walls greater than 4 feet in height must meet the following conditions. The wall must be”: <br />1. Designed to correct an established erosion problem: <br />The proposed retaining wall will provide slope stability in the area around the stair landing, <br />despite the applicant not indicating an erosion problem. Repeated access to the lake stair over <br />time may cause erosion in the future if left in its present condition. <br /> <br />2. Suitable given the demonstrated need: <br />The proposed retaining wall is suitable as the walls are minimal to correct the excessive slope <br />leading to the stair landing. <br />Application Summary: The applicant requests a conditional use permit for new retaining walls within <br />the lakeshore setback. <br />Staff Recommendation: Planning Staff recommends approval. <br />LR-1A District Required Existing Proposed <br />Lakeshore 75’ N/A ~28’ Proposed Retaining Wall <br />185
The URL can be used to link to this page
Your browser does not support the video tag.