Laserfiche WebLink
1 Drill pilot hole in the center of the rafterusing a 7/32” bit. <br />2 Place the InstaFlash over the pilot hole. Note: the direction of the InstaFlash Down arrows should point down the roof. <br />4Drive the lag until the InstaFlash is fully seated to the roof. <br />3 Insert the lag screw through the center hole into the pilot hole. <br />Pegasus Solar Inc | 506 West Ohio Avenue, Richmond, CA 94804 | www.pegasussolar.com <br /> PIF-RB0 PIF-RBDT PIF-RBSH PIF-RM0 PIF-RMDT <br />Finish <br />Kit Contents Black InstaFlash, 5/16” x 4.0” SS Lag <br />Black InstaFlash, 5/16” x 4.0” SS Lag, Dovetail T-bolt w/ Nut <br />Black InstaFlash, 5/16” x 4.0” SS Lag, M10 Hex Bolt w/ Nut <br />Mill Insta-Flash, 5/16” x 4.0” SS Lag <br />Mill InstaFlash, 5/16” x 4.0” SS Lag, Dovetail T-bolt w/ Nut <br />Attachment Type Rafter Attached <br />Roof Type <br />Sealant Application Factory Installed <br />Installation Temperature <br />Cure Time <br />Service Temperature <br />Certifications <br />Install Application <br />Kit Quantity 24 <br />Boxes per Pallet 36 <br />SPECIFICATIONS INSTAFLASH KITS <br />Black Mill <br />US Patents Pending. All rights reserved. ©2023 Pegasus Solar Inc. <br />IBC, ASCE/SEI 7-16, FL Cert of Approval FL41396, TAS 100(A), UL2703 <br />Instantly Waterproof; Non-hardening <br />0°F to 170° F <br />-40°F to 195° F <br />Most Railed Systems, Pegasus Tilt Leg Kit <br />Sloped Roof: Composition Shingle, Rolled Asphalt | Flat roof: Modified Bitumen Roof, Built-Up Roof <br />SCAN FOR <br />INSTALLATION <br /> VIDEO <br />SCAN FOR <br />FREE TRIAL