Laserfiche WebLink
APPLICATION FOR SEPTIC SYSTEM PERMIT 3 <br />CITY OF ORONO <br />Boz 66 (1335 So Brown Rd) <br />Crystal Bay, MN 55323 <br />General Instructions: <br />1. You may apply for septic system permits by mail or in person at the <br />City offices. However, permits will not be mailed out and must be <br />picked up in person at the City offices. <br />2. Permits are not valid until you receive a permit card. <br />3. Work must not begin unless the permit card is available on the job <br />site. <br />4. Permits will be issued only to contractors holding a City of Orono <br />Septic System Installer's License. <br />5. A 1 1 work must be done in accordance with the approved septic system <br />design. Design reports are not considered approved unless accompanied <br />by the "City of Orono Septic System Approval" cover sheet signed by <br />the City Inspector. <br />6. The following inspections will be required for all septic systems: <br />a) Pre -installation site inspection to include inspector, installer, <br />and general contractor. <br />b) Tank installation prior to covering. <br />c) Drainfield trench installation prior to covering. For mounds, <br />inspection is required after rough -up but prior to sand placement <br />(sand will be jar tested for silt content), and again during <br />pressure distribution piping installation in the rock bed. <br />d) Final inspection to verify proper final cover depths and to <br />verify that all pump station (where required) components are <br />functional and comply with codes. <br />7. Individual holding MPCA Installer Certificate shall be present during <br />installation. 24-hour notice is required for all inspections. <br />JOB SITE ADDRESS: <br />Occupancy Type: Residential ✓ Commercial Other <br />Owner's Name: Phone: ":Z_ y/ <br />Mailing Address: aii�y�.�.•�J.�k�� �����<<.��c,itY: c:haUo Zip: <br />Septic Contractor's Name: PA&ek�„�g CLPXQ, Bus. Phone: <br />Mailing Address:/;�s `lam w �5i City: <br />over - <br />