Laserfiche WebLink
T.H. 12 Corridor Study <br />Citizen’s Committee Minutes <br />Maple Plain City Hail <br />October 16, 1990 <br />-56 <br />N <br />Members Present! S. Hay, D. Cade, D. Hamilton, R. Gnitka, J. Berns, G. Cook, T. Wenz, <br />G. Johnson, E. Winston, E. Olson <br />Alternates Present: J. Massopust, R. Dayton <br />Others Presents L. Dallam, R. Harris, J. Knutson, M. Miller, M. Fischer, T. Olson, <br />A. Cosgrove, N. Stott, J. Stott, L. Shull, B. Field, G. Madson, K. Madson, P. Schroeder, <br />S. Payne, K. Gnitka, M, Weatherill, D. Challa, A. Peterson, G. Wetter, T. Ritchie, <br />C. Johnson, S. Ritchie, R. Scheuer, P. Pittel, S. Pittel <br />S. Hay opened the meeting shoniy after 4:00 p.m. The meeting agenda was approved as <br />submitted as were the minutes form the September 20 meeting. Dallam distributed <br />committee lists, discussed the modifications to the Goals/Issues/Concems paper that were <br />recommended at the September 26 Policy Committee meeting (Metropolitan concerns) and <br />the addition of a second goal for the City of Long Lake as a result of the Technical <br />Committee ’s recommendation at their October 16 meeting. (See updated paper). <br />Dallam also distributed a handout which identified Social, Economic, and Environmental <br />impacts to be evaluated for each alternative in the EIS. Also distributed was historic T.H. <br />12 traffic volume data and typical rural/urban freeway/expressway cross sections. <br />A discussion of possible alternatives was then begun. Dallam explained that the base map <br />represents the no-build alternative and other alternatives to it, and that each alternative <br />(except a mainline upgrade of T.H. 12) provides the ability to divert long through trips in <br />the project area. The five general corridor alternatives which were prepared using <br />committee input and available data sensitive to wetlands, parks, developed areas, etc. are <br />as follows: <br />1. <br />Z <br />Along T.H. 55 westward from 1-494 bypassing Rockford to the south; <br />New northern alignment (between T.H. 12 and T.H. 55), northwest from near <br />Femdale Road, through Medina, and westward through Independence (S. of CJi. <br />11); <br />3.Northwest from near Femdale Road and westward parallel with C.R. 6, then back <br />to mainline T.H. 12 east of Maple Plain; <br />fAToSt: the ebove have several variations through and bypassing Deiano before reconnecting to existing TJi. 12 in <br />FnmhUn TownMp)