Laserfiche WebLink
CONTINUATION SHEET <br />ORONO LIFT STATION <br />MA DOCUMEMr C70i (Instfuci.ons on roMMse si.le) »'v< 7 <br />AIA Document C702. APPLICATION AND CEKIIFlc:Ar£ FOK PV'jMFNr, tonij.n.n^ <br />Contractor ’s signed Ceriilicalion is attached <br />In tabulations below, amounts are slated to the nearest dulljr <br />Use Column I on Contracts where variable retamage for line items may apply <br />Al’PlK AflON NUMIUK; <br />APPl ICATION DAIE: <br />PERIOD 10. <br />AKl HUH r b PKOlFCr NO; <br />I <br />10/24/90 <br />10/24/90 <br />A B c D E F G M 1 <br />ITEM DESCRIPTION Of WORK SCHEDUUD WORK ( OMHlEfED MAIERIMS TOTAL %BVLANCE <br />TO FINISH <br />(C G) <br />RETAINAGE <br />NO.VAIUE FROM PREVIOUS <br />APPIICAIION <br />(P f E) <br />THIS PERIOD PRESENTLY <br />STORED <br />(NOT IN <br />D OR El <br />COMPLETED <br />AND STORED <br />TO DATE <br />(D t F) <br />(G -C) <br />1.Bond & Insurance 2,500.00 2,500.00 2,500.00 100 0 <br />2.Bypass 2,000.00 2.000.00 <br />3.Top slab 4,600.00 4.600.00 4,600.00100 0 <br />4.Demolition 1,000.00 1,000.00 <br />5.Grout Bottom ^ <br />Mi sc. Metals <br />1,000.00 1.000.00 <br />6.2,000.00 2,000.00 <br />7.Pumps 22,000.00 22,00^.00 <br />8.Piping 5.200.00 5,200.00 <br />9.Painting 300.00 300.00 <br />10.Site work- grading <br />bituminous <br />trees <br />fence <br />restoration <br />4,400.00 2,420.00 2,420.00 55 1,980.00 <br />11.Electrical 3,000.00 3,000.00 <br />48,000.00 9,520.00 9,520.00 38,480.00 <br />CtKIlMCAIt rUK CMMfSI • MM tUIHUN * t <br />THE AMERICAN INSTITUTE Of ARCHITECTS, 17J5 NEW TORK AVENUE N \V. WASMI nCTQs DC ’OOiX j G703 1983