My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-10-10 Septic System Design Specifications
Orono
>
Property Files
>
Street Address
>
C
>
Christine Drive
>
3505 Christine Drive - 05-117-23-12-0020
>
Septic
>
1987-10-10 Septic System Design Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2025 2:25:19 PM
Creation date
2/13/2025 2:18:51 PM
Metadata
Fields
Template:
x Address Old
House Number
3505
Street Name
Christine
Street Type
Drive
Address
3505 Christine Drive
PIN
0511723120020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY of ORONO <br />Yost ')ffice Box 66 • Crystal Bay, Minnesota 55323 • Municipal Offices <br />On the North Shore of Lake Minnetonka <br />March 1988 <br />SEPTIC SYSTM INSTALLATIONS - CONSTRUCTION i INSPECTION MVIRRIGMTS <br />A. All installations shall comply with the approves septic system design (the report you <br />work from should contain the City's signed and dated approval cover sheet, which <br />will note any required changes). _ <br />B. A11 inspections must be cal led -in at least 24 hours in advance to ensure timely <br />i ctiona (473-7357). The following inspections are required: <br />rl. Pre -installation site inspection (any time prior to installation; purpose is to <br />rify proposed system location and layout). <br />2�. Tank inspection (prior to covering). <br />3. Standard trench drainfield inspection (at least 751 complete but prior to <br />covering). <br />( 4. )lotted - Inspections ( 2 required) : <br />' After ground is roughed -up, but prior to sand placement. <br />When rock and piping are in place, but prior to covering. <br />�inal inspection <br />a. When final grading is complete. <br />b. Pump station function final inspection. <br />C. Special requirements for poW station inspection: <br />Pump stations have become an increasing problem due to a wide range of installation <br />and electrical connection methods, and due to varying per ,tions of who is responsible <br />for various portions of the installation (incl iq bui ling inspectors, electrical <br />inspectors, system installers, electricians,c eneral contractors). The following <br />procedure and policy is immediately placed in effect. - <br />a. The septic installer shall be responsib. a for ensuring that all electrical <br />connections conform exactly to the diagram snown on the back of this sheet (90 <br />EQCXPTIO�S) . <br />b. Septic installer shall call City for final pump station inspection when the pump, <br />floats, electrical connections, and alarm system are complete and working. The alarm <br />system will be tested, as will the pump on-off levels to ensure proper gallonage per <br />cycle. <br />C. Installer shall provide pump make and model number and a copy of the Pus:t: <br />Characteristic Curve to the inspector for filing in permanent City records. <br />d. Certificates of Occupancy for new residences will not be issued until the above <br />is completed. <br />Any questions? Contact Lyle Oman or Mike Gatfron at 473-7357. <br />BUILDING& ZONING - 473.7357 • ADMINISTRATION A FINA':sE - 4/.:'358 • PUBLIC WORKS - 473-7359 <br />ASSESSING <br />
The URL can be used to link to this page
Your browser does not support the video tag.