Laserfiche WebLink
On the Nortb Sbort- of <br />!rake ,Mhinetonka <br />ON-SITE SEWAGE TREATMENT CITY <br />INSPECTION REPORT i POST OFFICE BOX 66 <br />_ONO 1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />473-7357 <br />OWNER /l%rk !!d /1qp [�I✓S�r� ADDRESS <br />PERMIT NO.'S. % DATES CONTRACTORS <br />City Ordinance No. 210 requites that each onsite sewage treatment system in Orono be inspected on a regular basis. The on-site sewage <br />treatment system at the above address has been inspected and appears to fall into the category checked below. <br />(This is )A an existing system ❑ new construction) <br />191 Meets or exceeds current City standards in all respects relating to design, construction, and location. Appears to be operating <br />properly. <br />2 Does not meet all current City standards for new construction (1978 Code) but in most respects appears to be designed, <br />located, and constructed generally in accordance with previous codes. System appears to be functioning properly; no major <br />upgrading of the system is required at this time. <br />I—j 3 Does not meet current City standards in many respects relating to design, construction, or location. Appears to be operating <br />LL JJ adequately at this time, but has a relatively high potential for future problems. No major upgrading of system is required at <br />this time. <br />4 System may or may not meet current City standards for design, construction or location, but is failing to properly treat and <br />dispose of the current input, and is endangering a water supply, or is a source of pollution to surface or groundwaters, or is <br />creating a safety hazard, or is otherwise creating a public nuisance. Please contact the City Inspector to discuss system repair/ <br />replacement procedures. If drainfield replacement is necessary, soil testing will usually be required, and a design and site plan <br />must be submitted for review. Your contractor must obtain a permit before work is started. <br />SYSTEM CONDITION.( m Checked items may require your action) <br />TankJnspection indicates: <br />Pumpout not needed at this time. <br />❑ Solids accumulation in tanks indicates they should be pump - <br />ad out this year to help prevent future problems. <br />❑ Solids accumulation in tanks is at a critical level. Tanks <br />should be pumped out as soon as possible. <br />❑ System is discharging to surface. Tanks must be pumped <br />within 48 hours to eliminate surface discharge. <br />❑ Inspection risers mining—tanks could not be inspected. <br />Inspection risers (4" dia. pipe) must be installed in each tank <br />at next pumpout. If tanks have not been pumpers out within <br />the last three years, they should be pumped out now. <br />SITE CHARACTERISTICS: <br />Limiting Site Factors <br />❑ Slope <br />❑ soil <br />❑ High water table <br />❑ Lot size <br />❑ Lake, wetland, or stream <br />❑ Drainage <br />COMMENTS <br />7-".)o -,?,) <br />Date of Inspection <br />❑ Inspection pipe is located directly over tank baffle. (Does not <br />give accurate measurement of solids accumulation.) If tanks <br />have not been pumped out within the last three years, they <br />should be pumped out now. <br />Drainfield inspection indicates: <br />Drainfield is dry, no surfacing evident. <br />❑ Some evidence of surfacing, not critical yet. <br />❑ Drainfield is saturated and visibly discharging untreated <br />effluent to the surface. This condition may require replace- <br />ment or additions to drainfield. Contact the City Inspector <br />immediately. Repairs must be completed within 90 days. <br />❑ Drainfield extent and condition unknown <br />Potential for System Failure <br />Site Capabilities for <br />(depends on soil types, water <br />Future Expansion <br />table and system condition) <br />® Adequate <br />14 Low <br />❑ Fair <br />❑ Medium <br />❑ Poor <br />❑ High <br />❑ Inadequate <br />❑ System is causing visible <br />surface discharge. <br />Septic System Inspector <br />Note. In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, be advised that <br />this report does not guarantee or certify that an existing system will continue to function properly, but is merely an opinion of .e adequacy <br />of the system under current conditions based on the available information <br />This report must be kept on the premises with system location and pumping records. <br />WHITE COPY ! Inspector's File GOLD COPY / Homeowner <br />