My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-11-10 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
C
>
Christine Drive
>
3485 Christine Drive - 05-117-23-12-0021
>
Septic
>
1987-11-10 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 4:23:03 PM
Creation date
2/13/2025 10:55:55 AM
Metadata
Fields
Template:
x Address Old
House Number
3485
Street Name
Christine
Street Type
Drive
Address
3485 Christine Drive
PIN
0511723120021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S -P TESTING, INC. <br />951 KATYDID LANE <br />ST. MICHAEL, MN 55378 <br />497.3588 <br />STEVE SHIRMERS <br />November 10, 1987 <br />Tom Betz \ �' <br />Lot 4 of 41 <br />Auditor's Sub #203 <br />Stubbs Bay Rd. <br />Orono, Henn. Co., MN <br />This system is designed for a:Type 1, five bedroom home and in accordance <br />with the Minnesota Pollution.Control Agency standards'.WPC 40 and local <br />ordinances. <br />The soils on this -site are typical of SCS soils mapped - L+B - LeSueur loam <br />boardered by - Ha - Hamel loam. A seasonally high water table was located <br />at 22", 26", 30", & 42", (mottling). Due to the seasonally high water <br />table, a pressurized mound sybtem will need to be installed.' The bottom of <br />the rock bed must be located at least 3' above the seasonally high water <br />table. <br />The soils at a depth of 18" have a percolation rate averaging 5.4 min/inch <br />and are adequate for treating septic effluent. <br />A pumping chamber will need to be installed to lift the effluent to the <br />treatment area. <br />The manifold and supply line pipe must have back drainage to the pumping <br />chamber. The distribution pipes shall have their ends capped. Be sure <br />the rock and sand fill material .are clean. The sod layer below the <br />entire mounded area must be turned over, just break up the sod, be sure <br />not to over work. <br />The power supply and switches•must be located outside the manhole and <br />pumping chamber in -a weather proof enclosure. A warning device must be <br />installed with a light and sound device, this is in case of a pump failure. <br />(Mercury floats are a good method). <br />All neighboring wells are located more than 100' away from the proposed <br />treatment area. <br />Keep all heavy equipment off of the proposed treatment area before and <br />after construction.as much as pcesible. The treatment area shoui.3 be <br />marked off before construction. <br />With proper instal',�tion and maintenance, this system should have'no <br />problem'in treating septic effluent effectively. ' <br />It is recommended that the septic tanks be pumped every 2 years. <br />Soil and Percolation Testa t7, 8, Si <br />Septic System Design Steven B. Schirmers <br />SBS/ds <br />Im <br />
The URL can be used to link to this page
Your browser does not support the video tag.