My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-2025 CC Agenda Packet - revised
Orono
>
City Council
>
2025
>
02-10-2025 CC Agenda Packet - revised
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2025 3:54:50 PM
Creation date
2/10/2025 3:54:27 PM
Metadata
Fields
Template:
x Minutes and Agendas
Minutes or Agenda
Agenda
Meeting Date
2/10/2025
Board
City Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />1795 St. Clair Avenue | St. Paul, MN 55105 | (651) 696-5186 <br />www.oertelarchitects.com <br />An Affirmative Action, Equal Opportunity Employer <br /> <br />Date: Tuesday, January 28, 2025 <br /> <br />To: Adam Edwards, City Administrator/City Engineer, City of Orono <br /> <br />From: Thomas Stromsodt | Oertel Architects | Principal <br /> <br />RE: City of Orono Public Works – Exterior Site Improvements <br /> <br /> <br />As discussed, the City is interested in moving forward with planning, design, and analysis of the salt building and <br />storage bins planned for on the west side of the new building during the initial design/bid phase. <br /> <br />- The scope of services proposed through Oertel Architects includes architecture, structural engineering, and <br />electrical engineering. <br /> <br />FEE SCOPE ASSUMPTIONS: <br /> <br />o During the process, we will include (2) in-person meetings and (2) video coordination meetings <br /> <br />o The design document will be submitted in .pdf format <br /> <br />o Review sets will be provided for owner review and comments for each Task/Phase prior to <br />completion <br /> <br />o The design team will provide physical samples of materials and equipment for staff review, <br />selection, and comment as applicable <br /> <br />For the project as described, we propose the following design process and work scope efforts: <br /> <br />Task 1.0 – Review of Previous Design <br /> <br />Items to be reviewed: <br /> <br />-Overall layout of yard and structures <br />-Type and style of structures to be used <br /> <br />Deliverables: <br /> <br />1. 60% Review Drawings <br />2. Physical samples of building materials for review <br /> <br />Task 2.0 – Construction Documents <br /> <br />Items to be reviewed: <br /> <br />-Final layout of yard and structures <br />-Coordination with building suppliers and vendors <br />-Final Design Bid Documents <br /> <br />Deliverables: <br /> <br />1. Complete drawing package and specifications for bidding (90% and 100% Reviews) <br />2. Incorporate City of Orono bidding requirements into the project manual <br />3. Review plans with City Building Official for preliminary plan review <br />45
The URL can be used to link to this page
Your browser does not support the video tag.