Laserfiche WebLink
g CITY of ORONO <br />ti <br />ti <br />RESOLUTION OF THE CITY COUNCIL <br />��`9kESI34��G NO. <br />d. Signed and executed Flowage and Conservation Easement over the <br />wetlands and required buffer areas in Lots 1 and 2, as shown on the <br />survey by Meyer-Rohlin, Inc., dated January 24, 2006. <br />e. Drainage Easements to be taken over drainage way and detention areas <br />within plat. <br />f. Signed and executed buffer maintenance covenant. <br />g. Completed private covenant for all Lots regarding protection of <br />drainfield sites. Covenants to include protective language for primary <br />and alternate drainfield sites and to include the site plans locating both <br />the . primary and alternate sites. Subdivider to develop language <br />alerting future owners of need to protect sites on adjacent properties. <br />• Covenants must be in a form suitable for filing. The City has samples <br />of protective covenants used by former developers available for <br />review. <br />3. Fees to be paid: Total due: $30,489.20 * <br />a. Final plat fee = $250.00 <br />b. Legal review and filing fees for subdivison and associated documents <br />= $280.00 <br />C. *Park Dedication Fee: amount shall be determined as soon as City <br />Assessor has placed a fair market value on the undeveloped land at the <br />time of preliminary plat approval. The subdivider shall be advised as <br />soon as Assessor's report has been filed with City. <br />d. Storm Water and Drainage Trunk Fee = $29,959.20 [(6.14 acres @ <br />$2,280/acre) + (7.0 acres @ 2,280/acre )] <br />4. A copy of all necessary permits approved by the Minnehaha Creek <br />Watershed District. <br />• 5. Installation of a conforming septic mound treatment system on Lot 2. If a <br />septic system cannot be installed prior to the filing of the Final Plat <br />Page 6 of 7 <br />