Laserfiche WebLink
� � <br /> �O� <br /> �, O � O <br /> ' CITY of ORONO <br /> � � <br /> .., ti <br /> �� G'�' RESOLUTION OF THE CITY COUNCIL <br /> L`�kEsH.o�`'� No. 5 5 8 � . <br /> 3} The Development Plan shall meet all setback standards for <br /> building construction�and parking as established under the B — 6 <br /> Highway Commercial District requirements, as defined in the <br /> following table: <br /> Building/Development Standards Required <br /> Lot Area 2.0 acre min. <br /> Lot Width 100' <br /> Principal Structure Front(S) 30' <br /> � Setbacks <br /> Side(E) 35' . <br /> Side (W) 10' <br /> � . <br /> . ' Rear(N) 5' <br /> Parkinti Setbacics Front(S) 15' <br /> -includes drivin�lanes <br /> Side(E) 10' <br /> Side(W) 5' <br /> Rear(N) 10' <br /> Building Height Peak Height N A <br /> Defined Height 30' ma:c. <br /> The above table values are baseii on the B-6 standards found in <br /> Section 78-797 (1-5) of the Zoning Ordinance. <br /> 4) Appropriate traffic and parking signage within the property shall <br /> be installed subject to the Orono staff and City Engineer review <br /> and approval. <br /> 5) Applicant shall demonstrate to the Council's satisfaction that the <br /> front fa�ade of the buildings, as noted in Exhibit A, and <br /> � specifically implementation of an architectural feature to the roof,. <br /> are incorporated so as to break up the expanse of the front view of <br /> the roof. <br /> Page 5 of 12 <br />