Laserfiche WebLink
91890.3 P <br />TO: John R. Gerhardson, Public Works Director <br />Jeanne A. Mabusth, Building & Zoning Administrator <br />Michael P. Gaffron, Asst. Planning & Zoaing Admin. <br />FROM: Mark E. Bernhardson, City Administrate?)^^ <br />DATE: September 18, 1990 <br />SUBJECT: #1532 Fullerton Properties <br />As part of the subdivision of the Cox property, they have agreed <br />to include bike trails in the ten foot drainage and utility <br />easement abutting County Road 6 and Willow. Given the need for a <br />20' setback, for protecting the septic systems, if the trail <br />system is constructed, all drainfield sites as well as the trail <br />and easement site; should be staked. <br />A. ) Construction equipment must remain either in the 10 <br />foot easement or County 6 right-of-way and in no case go <br />closer than 20 feet to the primary or alternate septic <br />sites for Lots 1, 2 and 4. <br />B. ) For Lot 5, the alternate location can not be moved <br />and as such the equipment and trail construction must <br />maintain a 20 foot setback to that site. The trail <br />should be placed in the County Road 6 right-of-way in <br />areas where drainfield site is within 20 feet of the <br />easement (an area about 50-60' in length). <br />This should be incorporated as an addendum to the easement <br />granting this, the address file for each and on file with the <br />Bike/Trails information.