Laserfiche WebLink
City of ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 2826 <br />The following is a bid security required for the <br />project: <br />1) 5000 cubic yards conunon excavation at $2.00/cubic <br />yard = $10,000 <br />2) 3500 ton Class 5 100% crushed at $8.00/ton = <br />$28,000 <br />3) 650 bituminous surfacing at $22.00/ton *= $14,300 <br />4) 2 acres seeding with 4" topsoil and mulch at <br />$1000/acre = $2000 <br />5) Total = $54,300 <br />6) 50% increase = $27,150 <br />7) Total bid security required = $81,450 <br />By Mark Gronberg dated K*i,y 14, 1990, revised June 11, <br />1990. <br />b. Drainage swales and water quality structures as shown <br />in the grading and drainage plans. <br />c. Prior to any land alterations or road construction on <br />this site, the following septic envelopes must be fenced: <br />Lot 1, Block 2 - Septic envelopes 1 and 2 <br />Lot 5, Block 1 - Septic envelope 1. <br />Lot 8, Block 1 - Septic envelopes 1 and 2 <br />3. Execution of agreemen* with James Cox dealing with interim <br />use of additional right-of-way of Willow Drive and eventual <br />vacation of unused portion of additional right-of-way upon <br />determination of final upgrade of Willow Drive whether by City <br />based on MSA standard or as future County Road 116. Applicant to <br />advise if they wish the City attorney's office to prepare <br />Page 3 of 7