Laserfiche WebLink
Project Assessments and Costs <br />This will be a fully assessed sewer project. No City contribution toward the assessments will be <br />provided. The proposed project assessment is $19,100/unit payable over a fifteen year period. <br />Options for prepayment of the assessment are also available. Based on several projects completed <br />in 1997, the estimated interest rate is 6.25%. Based on a 15 yeai issessment at 6.25% interest, <br />the annual assessment payments will average approximately $2,000. The first assessment payment <br />would be added to the 1999 property tax bill. <br />The property owner is also responsible for payment of a $1,000 SAC (Sewer Availability Charge) <br />at the time the permit for connection is issued. This money is collected by the City and then <br />forwarded to the Metropolitan Council Environmental Services Division. This money is used to <br />pay for the additional opacity built in to the MCES sewer interceptor pipes for future connections <br />to the "ewer system. 1 s is a standard charge per rew sewer unit for the entire MCES system <br />in the metro area. <br />The sewer service pipes will be stubbed out to the property line. The property owner is then <br />responsible for hiring a licensed plumber to complete the hook up to the new sewer and to <br />properly abandon the existing septic system. The estimated cost for this work is approximately <br />$1,000 to $2,000. The City fee for the connection permit is $35.00. <br />The quarterly sewer rate for the entire City is a flat fee of $76.85 <br />Exclusion From The Project <br />The ideal situation is that all of the property owners will be included in the project. It is difficult <br />to have all of the owners in a project area agree to an assessment sewer project. Recognizing this <br />fact, the C'ty has adopted a policy that allows property owners to request exclusion from the <br />project if they havw . conforming septic system. If a property is excluded from the project and <br />requests a sewer connection at future date, a connection fee will be charged. This connection fee <br />will be the full project assessment, increased each year according to the annual inflation rate. This <br />entire fee will be payable upon connection without the benefit of the fifteen-year assessment <br />option for repayment. <br />Currently, property owners have a seven year period, from when notified their septic system is <br />determined to be non-conforming, within which to replace the system. The property owner will <br />be required to connect to sewer if the existing septic system becomes non-conforming due to any <br />future septic system regulations. Major repairs or replacement of an existing septic system will <br />not be allowed in an area where sanitary sewer is available. <br />Because the City will be covering the debt service charges for any properties excluded from the <br />project, the number of properties that can be excluded without making the project economically <br />unviable is limited. If a substantial majority of the properties are not included in the project, the