Laserfiche WebLink
HARDCOVEgXAl CULATION WORKSHEET <br />SETBACK ZOPTC: (CIRCLE ONE) Q-7^ 75-250’ 250-500’ <br />EXISTING HARDCOVER IN ZONE <br />A. House _______________ <br />Lengih <br />B. Garage <br />C. Driveway <br />D. Sidewalk <br />i <br />E. Paiio/Deck <br />*: T. Landscape <br />Underlain <br />By Plastic <br />Or Fabric/J,.Other <br />L'M TOTAL HARDCOVER IN ZONE <br />TOTAL PROPERTY AREA IN ZONE <br />s c> ^ <br />PROPOSED HARDCOVER IN ZONE <br />A. House <br />Length <br />B. Garage <br />C. Driveway <br />D. Sidewalk <br />E. Patio/Deck <br />F. Landscape <br />Underlain <br />By Plastic <br />Or Fabric <br />G. Other <br />Widih <br />■i- B O jCSO X 100 <br />WiOth <br />TOTAL HARDCOVER’N ZONE , - <br />TOTAL PROPERTY AREA IN ZONE - <br />A ZSW + B X 100 <br />500-1000’ <br />^3" S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />^^5 S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S6S__________S.F. <br />C»8c S.F. <br />■9.3 % <br />J^3 S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />/O/ <br />Jf <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />__________S.F. <br />4.^^____%