My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5504
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7499
>
Reso 5500 - 5599 (August 28, 2006 -April 7, 2007)
>
Resolution 5504
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2015 11:24:55 AM
Creation date
11/5/2015 11:24:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� °� . <br /> 0 0 <br /> • � 3 � CITY of ORON4 <br /> � , � <br /> --* . . ti <br /> ti <br /> RESOLUTION OF THE CITY COUNCIL <br /> ��`�kEsKo�`'�G No. 5 5 0 4 . <br /> 8. The subdivider and the owner of the:property at 2687 Wayzata Boulevard may <br /> enter into an agreement for a joint access to Wayzata Boulevard, either through a <br /> joint driveway or through easements to a driveway entirely on one of the � <br /> properties. The subdivider may allow the property at 2687 Wayzata Boulevard to <br /> access Old Crystal Bay Road or the new street across the subdivision. <br /> 9. Subdivider shall grant to the City 10 foot drainage and utility easements along <br /> perimeter property boundaries and 5 foot drainage and utility easements along all <br /> � interior property boundaries. Subdivider shall also grant to the City utility <br /> easements for any public utilities located outside these easements or public rights <br /> of way. <br /> 10. Payment of Park Dedication Fee for Lot 1 Block 1 and Lot 2 Block 2 per the City <br /> Fee Schedule, with credit for the cost of the bituminous trail required by <br /> Condition 6. <br /> • . . 11. Payment of standard Storm Water and Drainage Trunk Fee for the plat per the <br /> City Fee Schedule. <br /> � 12. Payment of Local sewer and water connection fees per the City Fee Schedule: <br /> 13. Prior to approval of the final plat the following plans and specifications shall be <br /> submitted for review and approval by the City and other appropriate jurisdictions, <br /> , to ensure that the proposed plat will accomplish the intended purposes: <br /> a) Final plans and specifications for all proposed utility lines and services. <br /> b) Road and trail construction plans including proposed plan and profile <br /> views, typical street section, geotechnical report, R-value <br /> recommendation, and pavement design and striping <br /> 14. Subdivider shall execute a Developer's Agreement for construction of the sanitary <br /> sewer, municipal water system, storm sewers and drainage system, trail, and <br /> public street (including striping of Old Crystal Bay Road North and adding the <br /> bituminous shoulder) to ensure all site improvements are installed to City's <br /> specifications and satisfaction. This Developer's Agreement shall include a <br /> requirement that a copy of the recorded Shared Facilities Agreement be provided <br /> • to the City after an individual lot is sold. A Letter of Credit must accompany the <br /> Developer's Agreement written to 125% of the City Engineer's estimated cost of <br /> Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.