Laserfiche WebLink
* V <br />(#8 - #2099 Brue^emann/Maeser • Continued) <br />Gaffitm <br />Oyy J5rue^(eniuiviviaa«i - ------ <br />v*B«. cooiinued thtf tfat «P P»y . '^^'onUa 10 ind <br />■u..«n>»n..m mp^ »k1 two «nUl cabins. Two <br />.^of <br />in size. This results in substandard variances for Lots 1 and .. <br />Gaf&on repotted that the front and back lot appUes. The 30 ’ <br />with 150*/. required for back/front J? .. „velope. In Lot 1. based on the <br />access outlet still required lea^ng a sm ^ leaving a building envelope of <br />firont/back configuration, a 50 side setb ^ -<,55 are required for Lots 1 and 2. <br />only 10 ’ wide, which is not suiiab e. ° ^ setback where 200* is necessary. Lot 1 <br />Lot 2 requires a 10* width v^ance house, which is proposed at <br />i?J !»»in j; «•''• <br />hardcover is aUowed Lot 2 does meet the hardcover stan <br />acceptable hardships. <br />„ .0,0..h. ‘s <br />stub The sewering was pan of the Stubbs Bay proje <br />many years They are located = „ ,,hich does not meet the 3' <br />there are three The septic system needs to be removed, <br />separation and is located m w„s„ was given two years by the Council in May of <br />Gafiron reminded th-t co'nnected to the sewer. This has <br />1995 to remove t e ca signed Brueegemann has proposed to <br />Tur^Se p"rope^'o bmld 2 houses on The less than 2 acre parcel where 5 acres are <br />required.