My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12.21.24 septic cert
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
2070 Shoreline Drive- 15-117-23-21-0005/12
>
Septic
>
12.21.24 septic cert
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2024 8:26:01 AM
Creation date
12/23/2024 8:25:20 AM
Metadata
Fields
Template:
x Address Old
House Number
2070
Street Name
Shoreline
Street Type
Drive
Document Type
Septic
PIN
1511723210005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMIT TYPE AND FEES <br />New or Replacement System $400.00 <br />Repair Existing System 100.00 <br />(Tanks or Drainfield) <br />�c <br />Total $ <br />The undersigned hereby applies to the City of Orono for issuance of a septic system <br />installation permit, agrees to do all the work in strict accordance with ordinances of the City <br />and regulations of the State of Minnesota and certifies that all statements made on this <br />application are complete, true and correct. <br />Signature of Applicant Date: /Z' -4 U <br />MPCA License No.: <br />Staff Review: ept ❑ Denied <br />Reviewer: �i„ Date: 'D <br />Reason for Denial: <br />Comments (to be printed on inspection card): <br />GENERAL INSTRUCTIONS <br />1. Applications for septic system permits may be mailed or submitted in person at the City <br />offices; however, permits will not be mailed out. The permit must be picked up in person at <br />the City offices and work must not begin unless the permit card is on the job site. <br />*** DO NOT MAIL PAYMENT WITH THIS APPLICATION *** <br />2. Permits will be only issued to contractors holding a Minnesota Pollution Control Agency <br />(MPCA) Septic System Installers License. <br />3. All work must be done in accordance with the approved septic system design. <br />4. The following inspections will be required for all septic systems. <br />A. Tank installation prior to covering. <br />B. Drainfield trench installation prior to covering. For mounds, inspection is required after <br />rough up, but prior to sand placement (sand must be jar tested for silt content) and <br />again during pressure distribution piping installation in the rock bed. <br />C. Final inspection to verify final cover depths and to verify that all pump station (where <br />required) components are functional and comply with codes. <br />5. MPCA licensed Installers or their DRP (Designated Responsible Person) shall be present <br />during all inspections. <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.