My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 1128
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 1100 - 1199 (January 15, 1980 - September 15, 1980)
>
Resolution 1128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2015 12:53:17 PM
Creation date
11/4/2015 12:53:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a <br /> - Cit� o� ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> � NO. 1128 <br /> • - • • <br /> CONSTRUCTION PERMITS A1dD INSPECTION FEES <br /> Applicable <br /> Permit Type Fee Code Section <br /> BUILDING PERMIT 20. 040 (Ord. 216 <br /> Minimum Fee $ 10. 00 <br /> Normal Fee (per 1979 UBC/SBC Standard Schedule) <br /> Plan Review Fee (per 1979 UBC/SBC Standard Schedule) <br /> PLUMBING PERMIT 2 . 00/fixture 21. 050 - - <br /> 20. 00/minimum/project <br /> Mail-in postage & handling charge 1. 00 <br /> I�IECHANICAL PERMIT ' 20. 040 (Ord. 216 <br /> Minimum Fee 20. 00 per project <br /> Mail-in postage & handling charge 1. 00 <br /> Residential, Single Family & Duplex <br /> -furnace or boiler with flue 10 . 00 each unit <br /> -wood stove with flue 10. 00 each unit <br /> -wood combination or add-on unit 20. 00 each unit <br /> -factory fireplace with flue 10 . 00 each unit <br /> -central air conditioning 10. 00 each system <br /> -exhaust fans (bath, kitchen, attic, etc. ) 5 . 00 each location <br /> -solar heating equipment 20. 00 each system <br /> -repairs and replacement of the above Minimum Fee <br /> Commercial, Industrial and Multi-Family Residential <br /> -residential type equipment per scheduie above <br /> -furnaces, boilers, unit heaters, and <br /> makeup air units 1 . 00 per 10, 000 btuh output <br /> -central air conditioning 5 . 00 per ton AC <br /> -exhaust fans 10 . 00 each <br /> -refrigeration 10 . 00 per compressor <br /> -fixed equipment with steam, hydraulic <br /> or comp, air system 2.00 per connection <br /> -fire sprinkler systems 20. 00 each project <br /> L <br /> PAG E 5 O F 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.