My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-08-1990 Council Packet
Orono
>
City Council
>
1990
>
01-08-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 2:18:12 PM
Creation date
12/17/2024 2:15:48 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Members of the Orono City Council <br />22 November 1989 <br />Page 3 <br />We believe that the water drainage proposal, prepared by Herb <br />Baldwin and reviewed with the City Engineer, will completely deal <br />with runoff. A line of 6" perforated drain tile will conduct <br />water to a wet well witn a perforated cover from where it will be <br />dispensed to and percolated through the 75'-250' area (see <br />exhibit A). The existing terrain along the house already drops <br />away from the lake embanrment so that the proposed arrangement <br />will simply be a reinforcement of current drainage patterns. We <br />are also willing to eliminate 68 s.f. of stone steppers and 16 <br />s.f. of retaining wall to further reduce the impact of water <br />runoff (see exhibit B). The retaining wall, screened by <br />plantings along the lake side, is itself an effort to manage <br />water runoff, in this case so that it does not further erode the <br />embankment, which is already slumping in spots. <br />Finally, we wish to bring to your attention the fact that <br />hardcover additions within the 0'-75' setback zone will represent <br />only a small percentage increase. (Hardcover in the 250'-500' <br />zone is only 6.3%, and in the 75'-250' zone will be only 18.3%.) <br />The following matrix represents existing and proposed changes <br />within the 0'-75' zone (see also exhibit C): <br />Permanent Structure <br />Existing <br />595 <br />% <br />2.2 <br />Proposed <br />765 <br />% <br />3.0 <br />Difference <br />170 <br />Retaining Walls/Stairs 325 1.2 421 1.6 96 <br />Paving 571 _6i.;?. 3 49 <br />TOTAL 1,491 5.7 1,797 6.9 306 <br />Unfortunately, there is virtually no existing hardcover that <br />could be removed to compensate for increases elsewhere. <br />We have worked with the Pillsburys to design an addition and <br />landscaping plan that has minimal environmental and visual impact <br />for others. That has always been their wish. We believe our <br />proposal accomplishes this while satisfying the requirements of <br />Orono's ordinances and provisions for hardship variances. We <br />look forward to further discussing the Pillsbury's request with <br />you during the November 27, 1989 meeting and answering any <br />remaining questions you may have about the project. <br />Sincerely <br />\ <br />Thomas Meyer <br />George and Sally Pillsbury <br />Herb Baldwin <br />S830/Ltlik«
The URL can be used to link to this page
Your browser does not support the video tag.