Laserfiche WebLink
*■? SB - 29S7 Start tan O^jwtlv* •It SB - Utt Start tkcB (Mwtlw •It SB > ISB Bart taoi <^aettr» ■M SB - ISM Star* Tam Bjwtlw GOK un'i'iiuCRT Cf OODmm B.CRT Htaxamam 1 mX 1SS9 - 30 WBIL ISM Draft 5/lS/SS taviaaa 1/30/n 7/31/W S/0V» S/»/W 10/31/B 12/04/89 12/27/89 <br />Mn GOM. AHB <br />1. oatmRT oevHiORair <br />A. Highway 12 <br />1. otilitlea <br />Sawer - Part I <br />Sower - Part II <br />Mater Systen <br />Main <br />CBJFCnVE <br />Install <br />Install <br />Install <br />»TES giMTS <br />09/01/89 Bids nose 6/30/89 <br />Project Ordered 7/24/89 <br />Negotiating Aamt Itena/bevelap Agnait <br />OoaaietKWd Construction 10^7/89 4 11/13/89 <br />well (6 aonths) <br />Ibwer (9-12 aonths) <br />Plans Specs - Order <br />Award <br />Financing <br />Nsgotiation on OtiUties <br />(Long Lake - Medina) <br />07/01/90 <br />09/01/89 <br />04/01/90 <br />07/0 V90 <br />09/89 <br />11/89 <br />09/11/89 <br />10/04/89 <br />S22ed'SSr^2 ’l0/27/89 4 11/13/89 <br />2/1/90 Need available water <br />9/U/89 T^le Test Well to 9/25/89 <br />9/25/89 Awarded Test Wells <br />U/1/89 IT...... Test DriUings <br />U/6/89 Test drilling found adequate aquifer <br />UA3/89 Interla production wll drilled <br />8A4/89 Bonl Resolution adapted <br />Requested to negotiate with Madina 10/23/89 <br />Bonl Sale Awardad/AAl Ratlng/6.S7% <br />Bond Closing <br />n aiaiiirnl water discussion 10/25/89 <br />with Medina - Medina to aeet with affactad <br />residents 1/90 to dtecsjas