Laserfiche WebLink
CITL' 4 ()ROAN <br />Building Permit <br />AND APPLICATION FOR CERTIFICATE OF OCCUPANCY <br />P.O. BOX 66. CRYSTAL BAY, MN 55323 473-7357 <br />ZONING DISTRICT <br />LR -1B <br />FIRE DEPARTMENT <br />Mound <br />POST OFFICE <br />Mound <br />VAR DATE Res. 2032 <br />XXX8/11/86 <br />COND USE DATE <br />LOT AREA <br />.73 Acres <br />WIDTH DEPTH <br />125 200'+ <br />PROPOSED SETBACKS <br />FR(?g1 R SIDE 20' <br />REA66R``JJ L SIDE <br />109, 40' <br />LAKE WETLANDS <br />NA <br />ACCESS Existng <br />NEW EXISTING <br />AGENCY-APPROV DATE <br />CITY <br />COUNTY <br />STATE <br />PRIVATE EASEMENT <br />REMARKS Curb Cut to t <br />PERMIT NO. 6376' <br />DATEISSUED 5/22/87 _ <br />1475 Cherry <br />Place <br />SITE ADDRESS <br />08-117-23 33 0025 <br />PROPERTY IDENTIFICATION NO IPIDI <br />LOT 7 , R , 9 BLOCK T <br />SUBDIVISION. Crystal Ray View <br />OWNER INamel <br />(Address) IPhone) <br />Steve Shields <br />560-8804 <br />_ <br />ARCHITECT 'ENGINEER - Must Certify Multi -Family. Commercial & Industrial Construction Plans <br />IFIrm1 <br />IAddressl (Phone) <br />Mtka Design, 337 Water <br />Street, Ecl. 474-5991 <br />BUILDER IFaml <br />IAddressl 475-3786 IPhonel <br />Eckley &Schneider, Const., <br />1430 Birch Bend Ln, Wayzata <br />TYPE OF WORK New Addition Remodel Renovate <br />New -Residence <br />CONST TYPE <br />BUILDING SIZE <br />Estimated Construction Valuation <br />Wood <br />40 26 <br />H112 <br />$82,000 <br />L W <br />OCCUPANCY <br />PERMIT FEES <br />CLASSIFICATION <br />BLDG. PERMIT 379.00 <br />DWELL <br />1 <br />STORIES B 1 <br />2 3 <br />UNITS <br />STATE FEE 41.00 <br />246.35 <br />GAR STALLS <br />NUMBER OF BEDROOMS <br />ATT 2 <br />2 <br />PLAN REVIEW <br />SEPTIC <br />DET <br />SAC CHARGE 525.00 <br />APP DATE <br />Trunk 225.00 <br />SEWER UNIT 1270. GO <br />PROPOSED USE <br />PARK FEE 390.00 <br />PENALTY <br />COUNCIL <br />APP DATE <br />OTHER <br />>e approved by John Gerhardson <br />IOTALDUE $3,076.35 <br />prior fn installation (473-73591 <br />SEPARATE FIREPLACE PERMIT REQUIRED. <br />INSPECTION REQUIRED <br />FOOTING Uefore pour <br />.. <br />...... FRAMING rough -1n <br />„ , ... INSULATION <br />] . , .... WALLBOARD before taping <br />• ... FINAL before occupancy <br />(] ...... SITE INSPECTION <br />WORK BEYOND OR WITHOUT A RE- <br />QUIRED INSPECTION WILL BE SUB- <br />JECT TO PENALTY <br />INSPECTIONS MUST BE CALLED -IN <br />24 HOURS IN ADVANCE <br />r:ORK REQUIRING <br />SEPARATE PERMITS <br />PLUMBING <br />MECHANICAL <br />WELL <br />SEPTIC <br />SEWER <br />WATER <br />GRADING & FILLING <br />FIRE <br />(;QPv Wiiflf FILE GREEN -FINANCE <br />CANARYINSPECTOR GOLD RECEIPT <br />PINK ASSESSOR <br />B.oWlrn►•q 6 Mr Co I C (0171001-44r0 <br />ACKNOWLEDGEMENT <br />THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE <br />® THE REAL IMPROVEMENTS SPECIFIED AND DECLARES <br />J UNDER PENALTY OF LAW ACKNOWLEDGEMENT AND ACCEPT. <br />ANCE OF ALL INFORMATION CONDITIONS AND REQUIRE - <br />0 MENTS REPRESENTED ON THIS DOCUMENT THE UNDER- <br />SIGNED FURTHER AGREES TO DO ALL WORK IN STRICT COM- <br />PLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE <br />r� 3F MINNESOTA BUILDING COD RE IREMENTS <br />El <br />Signature � � l to � l� <br />Approved �` 1.1,v of Orono Ilf <br />