Special investigation fee(work started without 100%of Building permit
<br /> obtaining a permit—applies even if no permit is fee
<br /> pulled)
<br /> Manufactured Home Installation$275.00 plus
<br /> State Surcharge and requires a regular building
<br /> permit if also doing basement,foundation,
<br /> garage or entryway,fees are based on sq.ft. $275.00
<br /> State Table
<br /> Refunds:80%of building permit fees on projects not yet started(within 90
<br /> days of permit issuance by municipality). No refund on plan review fees,
<br /> state surcharge or maintenance permits
<br /> City Administrator may require an erosion
<br /> control escrow for projects disturbing soils. $1,000.00
<br /> Valuation based on ICC 2024 Building Valuation
<br /> tables
<br /> Total Valuation Fee
<br /> $1.00 to$500 $29.50
<br /> $501.00 to$2,000.00 $28 for the first$500.00 plus$3.70 for each additional$100.00,or fraction thereof,to and
<br /> including$2,000.00
<br /> $2,001.00 to$25,000.00 $83.50 for the first$2,000.00 plus$16.55 for each additional$1,000.00,or fraction
<br /> thereof,to and including$25,000.00
<br /> $25,001.00 to$50,000.00 $464.15 for the first$25,000.00 plus$12 for each additional$1,000.00,or fraction
<br /> thereof,to and including$50,000.00
<br /> $50,001.00 to$100,000.00 $764.15 for the first$50,000.00 plus$8.45 for each additional$1,000.00,or fraction
<br /> thereof,to and including$100,000.00
<br /> $100,001.00 to$500,000.00 $1,186.64 for the first$100,000.00 plus$6.75 for each additional$1,000.00,or fraction
<br /> thereof,to and including$500,000.00
<br /> $500,001.00 to$1,000,000.00 $3,886.65 for the first$500,000.00 plus$5.50 for each additional$1,000.00,or fraction
<br /> thereof,to and including$1,000,000.00
<br /> $1,000,001.00 and up $6,636.65 for the first$1,000,000.00 plus$4.50 for each additional$1,000.00,or fraction
<br /> thereof
<br /> State Surcharge as required by State.
<br /> Demolition
<br /> Demolition:Principal structure $100.00
<br /> Demolition:Accessory structure/Septic system
<br /> (Per unit fee) $50.00
<br /> City Engineer may require an erosion control Not to Exceed
<br /> escrow for projects disturbing soils. $1,000.00
<br /> Page 4 of 18
<br />
|