My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #308 fee schedule
Orono
>
Ordinances
>
Ord #308 fee schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 3:43:56 PM
Creation date
12/10/2024 3:27:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit D. Utility Rates and Fees <br /> ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES <br /> Connection fees have been determined as a way to provide a fair and equitable recovery of the costs associated with providing water and wastewater <br /> utility services to new customers to avoid placing these costs on existing customers.The connection fee includes those portions of existing assets that will <br /> benefit new customers together with any anticipated future capital improvements constructed for the purpose of providing utility services to new <br /> customers.The connection charge applies to those properties not previously assessed for the associated utility project. <br /> Fee <br /> MUNICIPAL CONNECTION PERMIT <br /> Sewer (Includes one inspection) $150.00 <br /> SAC(Sewer Availability Charge)(MCES) $2,485.00 <br /> Water (Includes one inspection) $150.00 <br /> Horn <br /> Quote Basis <br /> Additional Connection inspection(Water or Sewer) $100.00 <br /> Additional Disconnection inspection(Water or Sewer: $100.00 <br /> POINT OF SALE SEWER SERVICE INFLOW&INFILTRATION INSPECTION FEES <br /> Residential-City Inspection $250.00 <br /> Residential -Private Inspection Review $100.00 <br /> Commercial <br /> $750.00 <br /> SEWER PROJECTS <br /> Connection to existing City Sewer System: $6,000 per unit <br /> Connection to City Sewer in areas still within their assessment window(less than 15 years since project was assessed)shall pay an amount equivalent <br /> to the assessment amount plus interest that residences were charged at the time of the project: <br /> Fee <br /> 2010 North Farm Road $ 23,280.00 <br /> 2014 Green Trees $ 24,780.00 <br /> 2015 Green Trees Extension $ 23,670.00 <br /> Connection to Sewer System in adjacent city <br /> Fee <br /> Connection to Long Lake Sewer System $1,900.00 or per current Long Lake Fee <br /> Schedule <br /> Connection to Wayzata Sewer System $1,050 or per current Wayzata Fee Schedule <br /> WATER CONNECTIONS <br /> Connection to existing City Water Main $4,370 per unit <br /> *or 20%over adjacent city's fee schedule,whichever is greater of <br /> Current Fee per Adjacent City Fee <br /> Connection to Long Lake Water System $1,900.00 or per current Long Lake Fee <br /> Schedule <br /> Connection to Wayzata Water System $2,470 or per current Wayzata Fee Schedule <br /> WATER METER AND HORN <br /> 5/8"(3/4"x7-1/2")meter with horn including sales tax Actual Cost <br /> • <br /> 3/4"(3/4"x9")meter with horn including sales tax Actual Cost <br /> 1"meter with horn including sales tax Actual Cost <br /> Larger meter Actual Cost <br /> Page 8 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.