My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-10-1990 Council Packet
Orono
>
City Council
>
1950-2024
>
1990-1996 Microfilm
>
1990
>
09-10-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 1:26:05 PM
Creation date
12/10/2024 1:24:17 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO REGULAR COUNCIL MEETING HELD AUGUST 27, 1990 <br />LMCD REPORT CONTINUED <br />Hurr said, "The administrative technician that we have hired will <br />relieve some of the need for the Milfoil consultant for the next <br />year. The Milfoil project is decided year by year. This person <br />would alleviate the need to hire a specific consultant to deal <br />with Milfoil.” <br />Nettles asked whether the LMCD is making any progress in <br />eradicating the Milfoil weed from Lake Minnetonka. <br />Hurr replied, "We are jrst keeping up." <br />Mayor Grabek said, "Norm Paurus was quoted as saying that <br />one-third of the Lake's recreational surface has been affected by <br />Eurasian Milfoil. That is a large area." <br />Mr. Strommen responded. "It all depends on how you look at <br />it. V^e have approximately 5,500 acres of area that is 15' of <br />water depth or less where the weed grows. Roughly 3,500 (60%) of <br />those acres are fairly well infested with Milfoil. Probably <br />one-half of that area is heavily matted to the point where a boat <br />could not go through. That is where v/e are concentrating our <br />harvesting efforts and where our 1,500 acre permit is applied. <br />V7e are not harvesting all of the heavily matted areas (such as <br />Smith's Bay) because the benefit of clearing the v/eed is not <br />equal to the cost. VJe are trying to keep the navigational <br />channels open to the docks that are in an area such as Smith Bay <br />to enable boaters to move in and out. There is still a lot of <br />lake area that can be used and enjoyed." <br />Callahan asked Mr. Strommen how the harvesting machines have <br />been performing. <br />Mr. Strommen replied, "We discovered in the last three weeks <br />that there is a design problem with the hydraulic system. A <br />local hydraulics firm helped us identify the problem and it has <br />been solved. We are still not satisfied with the amount of power <br />we are getting. The machines are running at five miles per hour <br />and we were hoping for seven or eight miles per hour. The <br />machines are new and sophisticated and we have had our share of <br />learning experiences and v;ear and tear. The manufacturer is <br />working with us to solve and improve on the components that are <br />not holding up. We are in the process of completing a warranty <br />resolution that will reimburse us for approximately $10,('00.00 <br />for labor and materials that have been used to keep the machines <br />functioning." <br />Hurr noted that the LMCD intends to continue cutting the <br />weed until the first week in September. <br />Mayor Grabek asked if it was not beneficial <br />September and October. <br />to cut in <br />- 2 -
The URL can be used to link to this page
Your browser does not support the video tag.