My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-10-1990 Council Packet
Orono
>
City Council
>
1990
>
09-10-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 1:26:05 PM
Creation date
12/10/2024 1:24:17 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
area studies, comprehensive plan updates, lake and marina issues, <br />zoning amendment updates, etc. <br />The solution presented is the addition of an on-site septic <br />person which would more fully handle the program together with <br />freeing up current people to concentrate in other building and <br />zoning areas. The proposed program cost and revenues are listed <br />below. <br />Estimated Cost <br />C3onpensation (Level 6) <br />Related Personnel Costs <br />Current Cost/Sumner <br />Net Cost Increase <br />1991 <br />$24,700 <br />5.500 <br />30,200 <br />4.500 <br />$25,700 <br />Top Step <br />(1991 Rates) <br />$29,000 <br />6,800 <br />35,500 <br />- 4,500 <br />$31,000 <br />Revenue Estimate <br />1990 $22,000 <br />1991 $28,000 <br />1992 $33,000 <br />The other build., ig and zoning revenues of $205,000 (89) covered a <br />substantial part of the other persons currently on the staff 1989 <br />departmental budget of $246,000. The proposal also includes an <br />increase from $20.00 which was reduced from *-he original $25.00 <br />in 1980 which would generate about $28,000 in 1991 and increase <br />to $30.00 which would generate about $33,000 at the current level <br />in 1992. (The consumer price index during the 10 year period <br />from 1980 to 1990 has increase over 60%.) In addition to the <br />proposed fee being on par or below that when it was originally <br />initiated the new position would also provide increased service <br />to those systems. It is estimated the cost of the temporary <br />position for the final 3 months of the year is about $4,000- <br />$4,500. <br />ALTERNATIVES <br />1. Employ a person full time as a septic inspector for the <br />balance of the year. <br />2. Employ a person in the septic inspector position starting in <br />1991. <br />3. Extend the current temporary position through the end of the <br />year given the budgetary timetable. <br />4. Table. <br />5. Conclude this temporary position when funds are depleted in <br />the middle of October. <br />RECOMMENDATION - It is recommended that the temporary person be <br />continued through the end of the year with the person being able <br />to update further inspections to the balance of the year plus the
The URL can be used to link to this page
Your browser does not support the video tag.