Laserfiche WebLink
T.H. 12 CORRIDOR STUDY <br />T.H. 101 - T.H. 25 <br />PROJECT GOALS/ISSUES/CONCERNS <br />Mn /DOT <br />Coal 1. Accommodate through tnps by auto and trucks at a high level of service along T.K <br />12. <br />Goal 2. Provide for the safe movement of vehicles along T.H. 12. <br />Goal 3. Enhance the economic vitality of the State of Minnesota. <br />Goal 4. Preserve the quality of the natural environment along T.H. IZ <br />Issues: <br />• obtaining political consensus on preferred corridor <br />• availability and source of funding for design and construction <br />• characteristics of new roadway (freeway vs. e.xpressway) <br />• access to T.H. 12 (type and spacing) <br />f^ong Lake <br />Goal 5. Provide a high quality of life for Long Lake residents. <br />Concerns: <br />impacts on local businesses and tax base. ^ ^ <br />impacts an the natural environment (lakes, water quality, wetlands). <br />Qrona <br />Goal d Provide a high quality of life for Orono residents. <br />Concerns: • w. <br />- .impacts on residential property <br />impacts on natural environment_______ <br />We, efficient movement of traffic <br />impacts on local businesses and tax base <br />1