My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-10-1990 Council Packet
Orono
>
City Council
>
1990
>
09-10-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 1:26:05 PM
Creation date
12/10/2024 1:24:17 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Other Business <br />Hay opened the meeting for questions from the audience. <br />- G. Johnson asked if the uncertainty on the design of the highway (expressway vs. <br />freeway) means that Mn/DOT has ruled out the option of toll road financing. <br />Reply: No. However, there has been no decision to study this option for the TH 12 <br />project, and in all likelihood, it will not be studied. The primaiy focus is upon <br />the selection of a corridor with minimal adverse impact on each city. <br />- R. Scheuer discussed Commissioner Levine’s 1989 announcement for a 1-year funding <br />project and how it affects the current project s hedule; requested an elaboration on <br />obtaining funds for the consultant to complete the EIS; and asked about the impact to the <br />project if mutual agreements aie not possible between the panicipaiing juri.‘-'<ictions (at <br />the end of the scoping process). <br />Reply: The funds for the scoping prtject have been allocated. Even though ncuract <br />execution took six months, a new schedule will not limit what will be <br />accomplished in the study. T. Hi mbert explained how Mn/DO’? r^*tains and uses <br />funds to hire consultants. Hay stated that Mn/DOT seeks City Council approval <br />on final design plans and geemetnes, and that if continued support tor the project <br />• cannot oe generated, it may choose to either by-pass the local governments <br />/ involved (case of extreme need) or place the project on a lower priority, which <br />would indefinitely jeopardize its completion. Humbert added that Mn/DOT does <br />not want to waste exocn^^d scoping/EIS efforts, and therefore seeks to obtain as <br />mudi cooperation from affected jurisd etions as possible throughout the study to <br />ensure a project’s comoletion. <br />Next Meeting <br />August 22, 1990, 5:30 p.m.. Maple Plain City Hall (all Policy Committee meetings ‘ .'1 be he' <br />the fourth Wednesday of each month). <br />Meeting adjournmeiit - 6: .30 p m. <br />RDH/mst
The URL can be used to link to this page
Your browser does not support the video tag.