My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-27-1990 Council Packet
Orono
>
City Council
>
1990
>
08-27-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2024 12:14:54 PM
Creation date
12/6/2024 12:10:21 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
609
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- air compressor 4,000 <br />- *85 GMC underbody <br />plow 4,800 <br />- water tank & tamper 5,000 <br />- power hack saw & <br />chain saw 1,450 <br />- air condition tractor 2,600 <br />- radio for sweeper <br />Building & Zoning department - <br />portable radio <br />800 <br />700 <br />Building Outlay Fund - No specific amounts have been budgeted for <br />1991 at this time, but will depend on the City facilities <br />progress. <br />Construction Funds <br />The Municipal State Aid Construction Fund and the Permanent <br />Improvement Revolving Fund have been added this year for <br />information purposes. No budget amounts are shown at this time <br />for 1991. However, it is anticipated that state aid monies will <br />be used to fund approximately $160,000 of the $560,000 bridge <br />project costs for the Old Crystal Bay Road bridge replacement in <br />1991. <br />Debt Service Funds <br />The final payment of $154,400 will be made in 1991 on the 1976 <br />Refunding Bonds. Other debt service fund payments will total <br />$249,640 in 1991. The outstanding principal balance at the end <br />of 1991 will be $1,100,000 for the Debt Service Funds bond <br />issues. <br />Enterprise Funds <br />Several significant changes have been incorporated in this budget <br />document. Within the Water Operating and Sewer Operating Funds <br />the construction and debt service for the 1989 G.O. Revenue Bonds <br />have been spread between the two funds and segregated by project <br />and debt redemption. A proportionate debt redemption schedule is <br />shown with the water portion and the sewer protion. Each project <br />is totalled separately, each debt service portion is totalled <br />separately; and the operation of the water system and the sewer <br />system is totalled separately. The depreciation is reflected as <br />an operating expense in all the enterprise funds this year and <br />all capital outlay from operations appears as a footnote and is <br />not included in the department or fund totals. The fund totals <br />in the Water Fund and the Sewer Fund will appear unusually high, <br />however, these totals include the utility construction projects <br />and debt service, which are funded separate from operations and <br />have separate cash accounts.
The URL can be used to link to this page
Your browser does not support the video tag.