My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-9-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
12-9-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2024 5:26:34 PM
Creation date
12/5/2024 5:18:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />232860v1 <br /> <br />13 <br />delay such burial until the ground becomes suitable for burial and shall <br />complete said burial no later than July 1st of each year. <br /> <br />d. Grantee shall ensure that all Installations and Drops are properly grounded <br />and that the Cable System meets or exceeds the applicable requirements of <br />the most current editions of the National Electrical Code (NFRA 70) and the <br />National Electrical Safety Code (ANSI C2). <br />(4) System Extensions. <br /> <br />a. Grantee shall construct and activate the Cable System at its sole cost and <br />expense to areas depicted on Exhibit A. <br /> <br />b. Grantee shall be obligated to extend plant to all areas of the City where the <br />density reaches or exceeds forty (40) homes per cable mile as measured from <br />the nearest Node or terminating amplifier required to deliver a signal that <br />complies with the FCC Technical Standards. <br />(5) Permits and Permit Fees. Grantee shall not construct any Cable System facilities until <br />Grantee has secured the necessary permits from the City , subject to any right-of-way <br />permit fee. Grantee and Subscribers shall not be required to pay a permit fee for <br />Drops or System Extensions that do not involve work within road or street rights-of- <br />way. <br /> <br />(6) City Code. Grantee shall comply with all relevant City Codes in the course of <br />fulfilling its obligations under this Franchise. <br />(7) Grantee's Facilities and Equipment. <br /> <br />a. In those areas of the City where transmission or distribution facilities of all or <br />a majority of the public utilities providing telephone and electric power <br />service are underground, the Grantee likewise shall construct, operate and <br />maintain its System underground, not including Subsection (7)(d) facilities <br />below. <br /> <br />b. Grantee shall be granted access to any easements granted to a public utility, <br />municipal utility or utility district in any areas annexed by City or new <br />developments. <br /> <br />c. In those areas of the City where Grantee's cables are located on the above- <br />ground transmission or distribution facilities of the utility providing telephone <br />or electric power service, and in the event that the facilities of both such <br />utilities subsequently are placed underground, then the Grantee likewise shall <br />remove its overhead facilities from any affected poles and construct, operate <br />and maintain its transmission and distribution facilities underground, at <br />Grantee's cost. <br /> <br />78
The URL can be used to link to this page
Your browser does not support the video tag.