Laserfiche WebLink
A=Active(currently contains liquid substances or temporarily empty and resumption of storage is anticipated within <br /> one year or contains no liquid substances but has not been closed according to Minn. R. 7151.8200) <br /> C= Closed(currently contains no liquid substances and resumption of storage is not anticipated within one year <br /> and tank has been closed in accordance with Minn. R. 7151.8200) <br /> Tank material <br /> S= Steel single wall <br /> SS= Stainless steel single wall <br /> DW= Steel double wall <br /> F= Fiberglass <br /> P= Plastic <br /> C=Tiled concrete <br /> O=Other(describe) <br /> Fabrication type <br /> SF= Shop-fabricated <br /> FE= Field-erected <br /> Tank foundation design(One or more as applicable) <br /> S =Tank resting on native soil, gravel, or sand <br /> L=Tank resting on synthetic liner on native soil, gravel, or sand <br /> C=Tank resting on concrete slab or pad (CC=concrete is coated) <br /> R=Tank resting on concrete ringwall <br /> E =Tank is elevated on supports <br /> O=Other(describe or provide a drawing) <br /> Capacity Year Fabrication <br /> Tank# Substance igallon�_ installed Status Tank Material �e Tank Foundation Desi� <br /> Last external inspection <br /> • Field-erected tanks=give date of last external inspection per API Standard 653 or other protocol. <br /> • Shop-fabricated tanks=give date of last periodic inspection per STI SP001-00 or other protocol. <br /> . None= never externally inspected to any protocol. <br /> Lastinternalinspection <br /> • Field-erected tanks=give date of last out-of-service internal inspection. Attach copy of full API Standard 653 <br /> inspection report, or inspection report summary, using MPCA Guidelines format. If inspection protocol was <br /> other than API 653, attach a description of the protocol and results of the inspection. If inspection report or <br /> summary has previously been submitted to the MPCA, mark Report Submitted (date). <br /> • Shop-fabricated tanks=give date of last certified inspection per STI SP001-00 or other protocol. <br /> • None= never internally inspected to any protocol. <br /> Next external inspection <br /> • Field-erected tanks only: give proposed date of next e�ernal inspection. <br /> Next internal inspection <br /> • Field-erected tanks: provide proposed date of next out-of-service internal inspection and justification(ten years <br /> from date of initial service for new tanks). <br /> • Shop-fabricated tanks: provide proposed date of ne�certified inspection and justification per STI SP001-00 or <br /> other protocol. <br /> Release Prevention Barrier(RPB), if any <br /> If the tank has a RPB placed under the tank which has the function of: <br /> 1. Preventing the escape of released material, and <br /> 2. Containing or channeling released material for leak detection; identify as either: <br /> S=synthetic liners <br /> C=concrete pads <br /> CL=clay liners <br /> DB =double steel bottom <br /> DB-L=double steel bottom with synthetic liner <br /> Other: describe yours <br /> t-a3-25 <br /> 4/4/07 Page 3 of 8 <br />