Laserfiche WebLink
The most desirable way for the project to proceed is to have the property <br />owner at 3061 Casco Point Road install the selected outfall line. The City <br />would then acquire the necessary easements and assess that cost over tne <br />entire watershed <br />- 8 • <br />01391179