Laserfiche WebLink
PROTECT COST AND ASSESSMEMT <br />The project cost and assessment rates for the storm water improvement are <br />outlined in this section with a detailed cost estimate provided in the <br />Appendix. The indicated prices are as projected for the 1988 construction <br />season (ENR 4500). <br />Alternate I <br />Alternate II <br />Alternate III <br />Estimated Project Cost <br />$ 9.230 <br />$10,100 <br />$10,600 <br />The project costs are proposed to be assessed to the benefiting property <br />owners in the watershed on an acreage basis. There are 3.25 acres in the <br />watershed with the cost per square foot for each alternate shown below. <br />estimated assessment rates <br />Project Cost <br />Alternate I <br />Alternate II <br />Alternate III <br />$ 9,230 <br />10,100 <br />10.600 <br />Assessment Rate <br />0.065/sq.ft. <br />0.071/sq.ft. <br />0.075/sq.ft. <br />The above indicated project costs do not include pending easements or pipe <br />lire easement acquisition costs. These costs could be as high as the <br />construction costs if condemnation is necessary. <br />- 6 - <br />01391179 <br />n <br />\ <br />,-