Laserfiche WebLink
m .'r* %. . <br />INTRODUCTION <br />The City of Orono has requested this report to detemine the best nethod <br />of handling the stons water runoff from a small watershed along Casco Point <br />Road. During construction of a new house at 3061 Casco Point Roadt one of two <br />existing outlet pipes were removed. The purpose of this study Is to determine <br />the else of the replacement outlet pipe. <br />The existing outlet pipe at 30SS Casco Point Road is not adequate to <br />handle a significant portion of the runoff. The pipe runs under the existing <br />hone and could not be repaired if a problem were to occur. Ve did not elect <br />to consider the capacity of this pipe when determining the sixe of the new <br />outlet pipe. <br />The drainage area is landlocked with no safe overflow drainageway. The <br />water will flow into the garage at 30S5 Casco Point Road before reaching a <br />natural overflow. <br />- 3 - <br />01391179 <br />I i <br />NiifiiiillilllllMiMil