My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Engineer Letter, Construction Status
Orono
>
Property Files
>
Street Address
>
C
>
Casco Point Road
>
3061 Casco Point Road - 20-117-23-34-0017
>
Correspondence
>
Engineer Letter, Construction Status
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 10:32:45 AM
Creation date
11/27/2024 9:24:07 AM
Metadata
Fields
Template:
x Address Old
House Number
3061
Street Name
Casco Point
Street Type
Road
Address
3061 Casco Point Road
PIN
2011723340017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />6, Be inconsistent with the objective of encouraging land <br />uses compatible with the preservation of the natural land <br />forms, vegetation and the marshes and wetlands, <br />(Generally, the house fit's with the original ground form <br />of the site and preserves the most desirable tree cover. <br />The adjustment of the land form has a positive impact on <br />the health, welfare, and safety of the residents by <br />providing flood protection as well as enhance'" .*nt, <br />stabilization and sediment control along the lakeshore.. <br />7, Includes development of land and water areas essential to <br />continue the temporary withholding of rapid runoff of <br />surface water which presently contributes to downstream <br />flooding or water pollution or for land and water areas <br />which provide ground water Th'iiiration which diminishes <br />the land area necessary to carry increased flows or storm <br />water following periods of heavy precipitation, <br />(Runoff will occur in a controlled fashion by overland <br />drainage and an existing sump catch basin. The flatter <br />slopes will catch sediments find other pollutants, <br />minimize erosion, provide ground water infiltration and <br />reduce runoff velocity. Steep slopes will be stabilized.) <br />Not only did the original lakeshore bank condition on the Waters' property <br />create an unsightly erosion and pollution concern, but the entire bank along the <br />Haters/Dennis properties has trapped water in their front yards creating a <br />hardship due to flooding. As previously discussed, the regrading and excavation <br />of a small portion of the lakeshore bank and overland drainage swale, as <br />proposed, resolves both problems and therefore the variance is justified. <br />Please feel free to contact me should you have any questions regarding this <br />variance requi <br />Respectfully Submitted <br />WESTWOOD PLANNING « ENGINEERING COMPANY <br />Greg Wiischlie <br />Senion Project Planner/Landscape Architect <br />GP:ls <br />Plan Attachments
The URL can be used to link to this page
Your browser does not support the video tag.